zinc brush finish kitchen sink tap - GFV-6077
zinc brush finish kitchen sink tap, 1.Body: Zinc; Handle: Zinc, 2.Pipe:SS, 3.Cartridge:1/2" Brass, 4.Surface:Chrome - details see: https://www.buildingsupplieshub.com/zinc-brush-finish-kitchen-sink-tap-10062491
Place of Origin: Fujian China (Mainland) | Brand Name: GFV | Model Number: GFV-6077 | Surface Finishing: Chrome |
Feature: Thermostatic Faucets | Surface Treatment: Polished | Installation Type: Wall Mounted | Number of Handles: Single Handle |
Style: Contemporary | Valve Core Material: Brass | Number of Holes for Installation: Single Hole | Spray Type: Pull Down |
material: zinc | color: brush finish | handle: zinc alloy | cartridge: 1/2" brass/copper |
Q'ty/box: 1pcs/box | Q'ty/Carton: 54pcs/box | pipe: stainless steel | nipple: brass/zinc |
OEM: yes | logo: GFV/OEM |
zinc brush finish kitchen sink tap
GFV 1/2" kitchen faucet make from zinc material, GFV use standard material produce, GFV control quality from material to end product , Surface chrome plating, beautiful and elegant. Product sell to southeast asia,europe,middle east ,and south america. comfortable feel light,durable watertight,anti-aging,according to standard production,low-price,high-quality.
Products Details:
Code No. | Product Size | Body Material | Handle Material | Cartridge Material | Weight Pcs |
GFV-6077 | 1/2" | Zinc | Zinc Alloy | 1/2" Brass/Copper | 490g |
Packing Details:
Code No. | Pcs/Box | Pcs/Carton | N.W/Ctn | G.W/Ctn | CBM/Ctn | Q'ty/20ft |
GFV-6077 | 1PCS | 54PCS | 23.22kgs | 25kgs | 0.065 | 430Carton |
Order Details:
Code No. | Unit Price | Moq | Port | Delivery Time |
GFV-6077 | Contact us | 1000pcs | Xiamen | 15days |
Note:For the price please contat us, and each item MOQ 500pcs to mixed
to 5000USD/order, delivery time depend on quantity.
Products Show Pictures: 100% Pictures From The Real Products
Factory Pictures:
100% Pictures From The Real Product
Packaging Detail:1pcs/bag, 1pcs/color box, 54pcs/ctn,also can according to client |
Delivery Detail:according to the quantity and usually one month after order |