XMWY slab formwork for concrete,replace table form/doka formwork - scaffolding for slab construction
Place of Origin: Hebei China (Mainland) | Brand Name: xmwy | Model Number: scaffolding for slab construction | material: Q235 cold rolled steel |
Certificate: electrophoretic painting | techniques: high frequency welded pipe | load capacity: 3 to 4 tons | use: concrete formwork building system |
advantages: adjustable, quick scaffolding | best match: plywood, wood board,bamboo |

slab formwork for concrete,replace table form/doka formwork
Related products:
formwork system, scaffold props,shuttering materials, base jack, plywood supporting,post shore, shoring props, steel pipe,galvanized scaffold plank,formwork accessories scaffolding coupler, double scaffold clamp, scaffold pipe clamp
ceiling/roof/floor slab formwork
1. Model:Slab Formwork(pure steel, electrophoretic painted)
2. Application: used together with plywood for concrete form.
3. Components:
-- Main Beam: length adjustable between 1.17m and 4.39m;
-- Sub Beam:normalsize in L1.15m
Material of Beam: cold rolled steel
-- Vertical prop: OD48mm*THK 3.0mm*L 2.55m(normal)
easily connected to reach any required height
-- Horizontal prop: OD48mm*THK 2.75mm*L 1.22m(normal)
-- 'U'-Screw: OD38mm*THK 3.0mm*L 0.6m(normal)
Material: seamless pipe, threaded
4. Load Capacity: 3 to 4 tons per s.q.m.(whole system)
5. Installation: A group of 4 workers can erect 300s.q.m in 8 hours.
6. Project Photos:
7. Design
We can design for each specific project according to your structural drawings.
We also have standard match that allow for more flexible uses.
Any further questions, pls feel free to contact with us.
It'd be pleasure to hear from your needs.
Packaging Detail:steel frame or in bulk |
Delivery Detail:1-15 days after receipt of deposit or original L/C |