wholesale price metal highway noise barrier ISO9001 factory - FL-n60
Type: Sound Barriers,shutter or perforated | Place of Origin: Hebei China (Mainland) | Brand Name: FOREVERLOVE | Model Number: FL-n60 |
Material: steel or aluminium | Material Thickness: 1.0mm-1.5mm | Panel Height: 0.5m, 1m | Panel Length: 2.0m, 2.5m, 3m, 4m |
Panel Thickness: 8cm, 10cm | Post: 100*100*6*8mm, 125*125*6.5*9mm, 150*150*7*10mm,175*175*7.5*11mm | Surface Treatment: PVC coated or powder coated | Colors: green, clear, opal etc. |
Certification: ISO9001, CE |
wholesale price metal highway noise barrier ISO9001 factory
1. noise reduction theory:
Noise barrier is installed between the sound source and receiver to have a function of noise reduction. Obviously, highway noise barrier is applied to highway to weaken the noise, so that the receiver zone would be affected smaller.
2. highway noise barrier specifications:
metal panel 1. material:aluminum, steel 2. height:0.5m, 1m or as customer's requirement. 3.length:2.0m, 2.5m, 3.0m, 4.0m 4. thickness:80mm,100mm 5.type:shutter or perforated | |
two types:shutter or perforated | |
inner material of noise barrier: Absorbing cotton insulation | |
post size 100*100*6*8mm 125*125*6.5*9mm 150*150*7*10mm 175*175*7.5*11mm |
3. highway noise barrier productive process:
sheet cutting--punching--assembling--packing
4. noise barrier applications:
*highway noise barrier
*railway noise barrier
*neighborhood noise barrier
*industrial area noise barrier
5. noise barrier features:
1) High light transmission
2) Weather resistance
3) Fire retardant
4) Temperature property
5) Light weight
6. package and loading:
plastic film with wooden or metal pallet
7. About us
Anping Forever Love Wire Mesh Products Co., Ltd.is engaged in production and development of noise barrier which is our featured product, wire mesh fence, barbed wire, gabion, and related products based in Anping, Hebei province, China, the famous wire mesh land of China.
Welcome your inquiry!
Packaging Detail:steel pallet and plastic film |
Delivery Detail:within 15-20 days after received the deposit |