Walk Thru Scaffolding Frames/mason frame - Zhanye001,ZY001
Place of Origin: Tianjin China (Mainland) | Brand Name: zhanye | Model Number: Zhanye001,ZY001 | Raw material: Q235 |
Frame Weight: 22.61kg | Size: 1524mm X1930mm(H6'4" xW 5') | Connecting Pins: 2pcs | Type: Light Duty |
Finish: Powder Coated HDG | Sample: Free | Color: RAL Color | Clamps: 4pcs |
1524mm(5') X1930mm(6'4") Walk Thru Frames
I. Basic Information:
• Key Word: Walk Through Scaffolding Frames
• Surface Treatment: Powder Coated
• Color: Blue Colors
• Packaging details: Standard Seaworthy Packing Or Customizd
• Delivery time:2-3 Weeks After Order Being Confirmed
• Minimum order: 570pcs
• Supply ability: 15-20 Containers/ Month
• Loading Information:570sets frame together With 1140pcs Cross Brace Or Max
756Sets Only Frames
No | Item | Data |
1 | Brand | ZhanYe |
2 | Model | ZY001 |
3 | Material | Q235 |
4 | Finish | Power Coated |
5 | Color | RAL Colors |
6 | Approximate Weight | 22.61kg |
7 | W X H | 5' X 6'4'' |
8 | Main Tube | 43mmX2.4mm |
9 | Connecting Pins | 2 |
10 | Spring Clips | 4 |
12 | OEM Service | Offered |
I .Packing Details:
Palletzied With Thin Film Packed Or As Per Customer's Requirement
III. Delivery Time
2-3 Weeks Upon Order Confirmed
IV. Quality Inspections:
Pre-Shipment Inspections Are Accpetable
V. Product Superiorities:
No | Item |
1 | Easily Installation And Dismount, Extremely Save labor cost |
2 | Beautiful Shining Powder Coated , Without Swelling/Lump On Surface |
3 | 2-3 Weeks Taken To Finish A 20' Container Upon Order Confirmed |
4 | Quality Approved By American Market Through 6 Years Cooperation |
Whyus?
Our company is a professional manufacturer of Scaffolding Frames, Scaffolding shoring prop,Screw jack, Cross brase , Bridge Leg, Aluminium Plank,Stairway Unit ,Aluminum Formwork,Steel Pipes, etc. We mainly have worked with NothAmerica,South America,India,Europe about six years.
Packaging Detail:Thin Film Packed With Pallet Or Customized |
Delivery Detail:2-3 Weeks After Production |