unit bathroom pod - ASI BP07
1. Australia standard, 2. CE certificated, 3. Customer modular design, 4. Quickly site assemble, 5. Competitive price - details see: https://www.buildingsupplieshub.com/unit-bathroom-pod-10016427
Type: Other Accessories | Place of Origin: Zhejiang China (Mainland) | Brand Name: silverwood | Model Number: ASI BP07 |
Material: Metal | Countertop Material: Ceramic | Installation Type: Wall Mounted |
SilverwoodBATHROOM PODsystem
- It can be any dimension, it is suitable for the hotel bathroom, motel bathroom, family kitchen design etc.
- We have got the CE certificated for the modified shipping container house house system. And we can supply different country standard for the electrical and sanitary
- We have exported the products more than 50 country around the world. And have more than 10 years experience in this region.
- Do not need any site assemble, because all the things are finished in the factory, you just need to connect the municipal service with the container.
- We got the Australia standard window, sanitary, electrical, water pipe etc, and our framing system have already proved by the Australia Engineer.
- We have more than 100000sqm factory area, and the modified shipping container house manufacture capacity can be 100units per month.
Material specification | ||
1 | Steel framing | Light gauge steel framing system |
2 | Dimension | Any dimension, but fit the container shipping |
3 | Roof | / |
4 | Floor | 18mm fiber-cement board+10mm anti-slip ceramic |
5 | Window | AS standard aluminum double glass sliding window |
6 | External door | Wooden door |
7 | Internal door | Wooden door |
8 | External wall | / |
9 | Internal wall | 12mm fiber-cement board+water-proof treatment+10mm wall ceramic |
10 | Ceiling | 12mm Water-proof Gyproc with emusion paint |
11 | Sanitary | White ceramic, water-mark certificate |
12 | Kitchen | MDF cabinet surface with lacquered paint and bench top with quartz stone |
13 | Electrical fittings | Wiring, power point, switch, light, circuit-breaker etc |
Package:
- All the materials are well packed by the plywood or the steel skid before loading the container.
- The bathroom pod need put inside the container for shipping.
- All the materials are well fixed and tight to prevent the moving during the transport.
Packaging Detail:40 HQ container |
Delivery Detail:30 days |