The first USES vertical fluidized bed gypsum powder machinery production - SMP-BHR
Place of Origin: Hebei China (Mainland) | Brand Name: Rubin | Model Number: SMP-BHR | Experience: 13 years |
machine installation and commission: 2 to 4 months | Guarantee: 5 years | Iterm: gypsum powder machine | Checking: CIQ, SGS |
Automatic: Full automatic | Situation: Brand new | Technology: Newest advanced tech and German tech | Fuel: Coal, natural gas, heavy oil or light oil |
delivery time: 2 to 5 months after the deposit |
The first USES vertical fluidized bed gypsum powder machinery production
5years Guarantee & Designing & Manufacturing & Installation &Training
1. Brief introduction ofGypsum Powder Production Line
The crusher breaks the big sized gypsum ore into small ones with 25mm in diameter. After storing and conveying, they are taken into the mill for grinding. Then, the powder concentrator carries the gypsum powder which match to the needed fineness to the calciner for calcining. Others are back to the mill until it is qualified. In the end, after calcining, the qualified gypsum powder are sent to clinker container for storing, or are sent to the manufacturing workshops for use.
Iterm | Gypsum Powder Production Line |
Style | Calciner( fluidized bed furnace) |
Annual capactiy | 15000 to 200000 tons |
Experience | 13 years ( Chinese Army manufacturer ) |
Guarantee | 5 years and forever after sales service |
Coopration Countries | Iran, Pakistan, India, Ethiopian, Uzbekistan, Egypt, Saudi Arabia, ect. |
Workers needs | 16 Total |
Fuel variety | Coal, natural gas, diesel oil, heavy oil, ect. |
Payment terms | TT or LC |
Port | Tianjin,Xingang |
Delivery Time | 2 to 5 month after receive the deposit |
Packing | In wooden case and in nude 40GP container and FR container average weight of container: 20 tons |
2. the Process of Gypsum Powder Production Line:
3.Product characteristics:
1. Low investement ,low energy consumption,high output;
2. Owing more than 13 years of gypsum powder production line technical professional experience;
3.We develop a new kind of dehydrated equipment-calciner which can meet all the requirements for
gypsum powders’ production line.
4.Packaging:
In wooden case and in nude
40GP container and FR container
Average weight of container:20T
5.Cooperation customers:
6.After-sale service:
1.The machine's guarantee is 5 years( except the wearing parts such as bearings,electric buttons etc.)
2.Machine delivery time:2 to 5 months after the deposit.
3.Payment terms:T/T or L/C
4.Machine installation and commission:2 to 4 months when the buyer prepare the installation and commission conditions.
5.We offer engineers train the buyers' worker to operate the machine and after you master the machine then pay us the installation and commission payment.
6.In order to guarantee the machine running,each year we will send engineer to check and development the technology with the buyer.
7.If the buyer can not run the machine well then we will send the production engineers to help the buyer to run the machine,and we can cooperate for long time.
for more information,pls contact Rubin Zhang, 008613833188732
Packaging Detail:In wooden case and in nude 40GP container and FR container average weight of container: 20 tons we can offer loading pictures for your reference |
Delivery Detail:2 to 5 month after deposit |