Steel Workshop - PH1395 Steel Workshop
Steel Workshop, a) Light weight, easy to ship, b) Easy to build and rebuild, c) Waterproof structure, d) OEM/ODM - details see: https://www.buildingsupplieshub.com/steel-workshop-10039827
Place of Origin: Shanghai China (Mainland) | Brand Name: iven Steel Workshop | Model Number: PH1395 Steel Workshop | Main structure: H type column, Z type purlin, C type purlin |
Wall system: EPS/Rock Wool Panel | Roof: EPS Sandwich Panel / Corrugrated Color Steel | Floor/foundation: Concrete | Window: Aluminum Alloy |
Door: Steel Door / Auto Rolling Door | Crane: With or W/O ,5T,6T,10T,20T and above | Insulation: Glass Wool | Size: As Your Requirement |
Connection: High Strength Bolt |
Steel Workshop
Product Description
Main application:
Workshop, warehouse, transportation hall, canteen, exhibition hall, stores, etc.
Feature:
- light weight, it is almost 1/30 of the same masonry-concrete structure building ;lower foundation coast.
- small frame section ,good rigidity,high availability of utilization area and space,especially for low-level long-span construction.
- short construction period and small area occupy.
- stong corrosion resistance ,good durability, high reliability,applicable to factories, warehouses,and so on ,the service life is 15-25 years and max up to 35 years.
- roof and wall use light weght sandwich panel or color steel sheeting ,better in globality ,high wind resistance and warthquake resistance ability,light and handy ,generous and colorful.
Primary Competitive
Advantages:
- Well and High Quality Control
- Prompt Delivery
- Customer's Designs and Logos are Welcome
- Competitive Prices
- Earth-friendly Products
- In a Variety of Designs
- Small Order Acceptable
- OEM Accepted
Shipping and Payment
Packing | Export standard package |
MOQ | 1 set |
FOB price | Please contact for new price |
Delivery time | 15-45 days after deposit received |
FOB port | Shanghai |
Payment terms | T/T,L/C at sight |
Company Information
Packaging Detail:export standard package |
Delivery Detail:15-45 days after deposit received |