steel structured prefabricated warehouse/plants/building - BBS-TK-013
1.Wide Application;, 2.Shorten Construction Period;, 3.Durability and Convenient maintaining;, 4.Artistic Appearance - details see: https://www.buildingsupplieshub.com/steel-structured-prefabricated-warehouse-plants-building-10040849
Place of Origin: Zhejiang China (Mainland) | Brand Name: BBS | Model Number: BBS-TK-013 | Wall: EPS panel |
structure: Q345 steel frame | Roof: metal sheet |
SUPPLY CHAIN
PRODUCT PARAMETER
NO. | ITEM | TECNICAL DATA |
1 | galvanized steel | q235/345 |
2 | roof snow load | 1.55kn |
3 | wind load | 50m/s |
4 | life span of main sturcture | 70 years |
5 | Anti-seismic | 8 degree |
6 | fiber- glass thermal insulation | R19/wall |
7 | fiber-glass thermal insulation | R30/roof |
8 | window | plastic and steel/aluminium. |
PRODUCT FEATURES
1. eco-friendly
2.quick to install
3. seismic resistant
4. economical
PRODUCT PICTURES
CONTACT INFORMATION
TERMS & CONDITIONS
Payment: we usually accept T/T,L/C, D/P, D/A, OA, please send email to negotiate payment term if you can not accept T/T or L/C
Delivery Time:
Design stage: 3 to 10 days after receive
LGS Frame manufacturing lead time: 15-30 days 40% deposit
Pre-assembly time: 3~7days
For urgent order, Could be faster, please send email to negotiate
How to make an order?
1. Make house design (or to choose from the design collections)
2. Manufacture the LGS steel frame, purchase other materials from cooperative-companies
3. Make pre-assembly ( if required)
4. Inspection
5.Arrange shipment
prefabricated warehouse|prefabriated warehouse|prefabricated warehouse
Packaging Detail:as required for prefabricated warehouse |
Delivery Detail:20 days for prefabricated warehouse |