steel structure warehouse to Central Africa country 00153 - Saudi Arabia,steel construction steel warehouses L
Place of Origin: Shandong China (Mainland) | Brand Name: Mozambique,4 units steel structure steel frame structure building | Model Number: Saudi Arabia,steel construction steel warehouses L10000mxW10000mxH45m | prefabricated steel structure workshop: prefabricated warehouse building |
Roof and Wall panel:: EPS, PU ,Rock Wool sandwich panel or single iron sheet | door: steel hangar door 10mx10m | Window:: belt window,or PVC or Aluminum Alloy | Surface:: Hot-dip galvanized or Painted |
Rwanda: Saint Vincent and the Grenadines | Performance:: Safety,Water-proof,sound-insulated,heat-preservation | steel warehouse hangar: industrial hangar | aircraft hangar: prefabricated hangar |
Saint Lucia: Saint Kitts and Nevis |
prefabricated steel structure workshop
steel structure warehouse workshop shed
steel frame workshop
steel structural steel frame workshop
galvanized steel construction workshop
metal buildings steel sheds steel garage steel frame buildings portable buildings
FIRST PART, OUR COMMENTS AND IDEAS:
1 . | we design,fabricate,export,install following steel structure building projects: small factory building,corrugated steel buildings,steel structure hotel building,teel construction factory building,strand steel buildings,dome steel buildings,corrugated steel buildings,curved steel building,prefab steel building,abc steel buildings,pre engineering steel structure building,arch steel building,steel arch warehouse building,steel apartment building,single slope steel building,mini warehouse buildings,steel building motel,grain storage buildings,building steel formwork profile, steel building sliding garage door,inflatable buildings portable temporary structures, curved steel building machinery,steel strips polished metal building materials, india famous buildings |
2.options | 1)we can design,fabricate,supply,export,install all kinds of steel structures welded parts,steel buildings,metal building,modular house,steel frame for warehouse,workshop,garage etc,steel beams,H beams,other riveting and welding parts |
2)we can also make and develop new parts according to customer's drawings and detailed dimensions. | |
3. | specifications |
1)different size:MOQ is 10m2,including width X length X eave height,roof slope | |
2) Type:Single slope, double slope, muti slope; Single span, double-span, Multi-span, single floor, double floor,or three levels | |
3) Base:Cement and steel foundation bolts | |
4) Column and beam:Material Q345(S355JR)or Q235(S235JR) steel, all bolts connection! Straight cross-s cross-section! | |
5) Bracing: X or V or other type bracing made from angle, round pipe, etc | |
6) C or z purlin:Size from C120~C320, Z100~Z200 | |
7) Roof and wall panel:Single colorfull corrugated steel sheet0.326~0.8mm thick, | |
YX28-205-820(820) sandwich panel with EPS, ROCK WOOL, PU etc insulation | |
thickness around 50mm~150mm, width | |
8)Accessories:Semi-transparent skylight belts, Ventilators, down pipe, outer gutter, | |
9)Surfrace: Paint or hot dip galvanize! | |
10) Packing: Main steel frame without packing load in 40'OT, roof and wall panel load in 40'HQ! | |
4 | design parameters, If you need we design for you, pls supply us the following parameter together with detail size: |
1)Live load on roof(KN/M2) | |
2)Wind speed(KM/H) | |
3)Snow load (KG/M2) if have | |
4)Earthquake load if have | |
5)Crane (if have) ,Crane span, crane lift height, max lift capacity, max wheel pressure and min whe | |
FIRST PART,Pls be informed that we have been exporting our
1)Steel Structure Building
2)Metal Building
3)Steel Structure Warehouse
4)Workshop/Factory/Shed/Hangar/Gagrage
5)Steel Beams Other Riveting and Welding Parts
6)OEM Projects
7)Turn Key Projects
of
we have exported our 16000m2 steel structure workshop building,4-storeys steel structure factory building to Argentina successfully during past period,
2. Building site : Argentina
Building type : 4-storeys metal building steel structure workshop
Structural steelwork used: 210 tons
Steel building contractor:Abrons Construction CO Inc
Steel building subcontractor:Qingdao Borun steel
Construction detailling software: XSTEEL
Welding technology: conformity with AWS certificate
Seam : 100% full penetration welding seam
Surface treatment: primary member painted Jotun brand epoxy zinc rich primer, secondary member,purlines and addtional fittings,accessories galvanized.
5)Our Several first old Argentina clients are purchasing and importing steel warehouse buildings from
us regularly bos of our excellent quality with competitive price.
6)As they have good coorporation experiences with us,they are satisfactory with our fabrication
quality,good price level,and punctual delivery period,so they once more introduced to us many
clients.
7)Later one of many steel structure buildings is for United Arab Emirates Alexmar Company’s steel
structure prefabricated steel building,From the attached drawing, the structure is divided into 3
parts: 65*16+60*8+60*4
a-The central (main) part “A” is 65M long x16M width x 10M height.
b-The part on the left “B” (Control room), attached to the central part , 60M Long x 8.0M
width x 5.0M height ( The roof will carry 12 blowers each about 750 Kg).
c-The part on the right “C” is a structure attached to the central part, 60M long x 4.0M
width x 4.5M height. This structure is uncovered and carries the exhaust pipes and Exhaust
gas boilers of total distributed weight of about 16 Tons.
Our offer includes the following:
1.15Ton LC overhead crane complete.
2.All doors to the gen set hall and to the control room building as per the attached drawing.
3.Double glaze fixed windows between the control room and the gen set hall as per section
AA of the attached drawing Rev 7.
4.Walk way at height about 5.0M as shown in section FF of the attached Rev 7, complete
with hand rail and ladders at both ends.
5.Catwalk of checkered plate on the roof of the control room for the service of the air
blowers with one side hand rail and ladders at both ends.
8)our steel structures are also used in
IRAQ
Salahuddin Refinery Project
Baiji Oil Refinery Project
Baiji Oil Refinery - Lube Oil Unit Project
Third part,our Steel structure is widely used in easy factory construction. It has short period construction, economical and beautiful advantages, easy to install.We design,manufacture,process,fabricate,
Assemble various types of heteromorphosis steel structure elements,abnormal structural steel steel structure materials,allotype structural steel buildings and projects,steel structure corridors,various kinds of steel roofing configuration,steel buildings,steel building.
We have designed,fabricated,exported our Steel structure building 25000m2 to Australia and 420mt steel building to USA.
1. Our Steel structure building Steel building warehouse meet USA standards:
2. Our steel building warehouse meet Australias standards:
We have exported our steel building warehouse steel building Steel Structure
workshop 25000m2 to Australia
-AS1163-1991 Grade C350 LO/C450 LO
---BoxSection 89mm x 89mm x 3.5mm(thickness)
---also gavanized(hot dip zinc coated) to AS/NZS4792(galv. Coating
3.Pls be informed that During past steel structure experiences of more than 7 years,Our engineers had gone to Tanzania,Zambia,GHANA,CONGO,MALI,NIGERIA,LIBYA to install 1560.77m2 and Zambia 7296m2 steel building steel structure warehouse building. We could install our steel building steel structure warehouse all over the world.
Steel grade: Q345B.
Thickness of plates: δ6~δ40
Welding: Complete penetration of most welds.
Member description: This project includes welded H section columns, big section height welded H section crane girder. Complicated frame demand processing in whole member, with difficulties of turning and transporting of 40MT one unit. And crane girder has big section height, thick plates, high demanding in welding, and full completely penetration between flange and webs.
5th point,Because of our sincerely service attitude,truely solve the owner’s difficulties,think the owner’s thought as our own thought,the owner have continuously orderedsecond phase steel structure project,third phase steel structure project.The same owner has subscribed contract, of who ask us to fabricate ,supply 14-storeys ,30,000 square meters steel structure Grand Hotel building.
6TH our steel structure is widely used in easy factory construction. It has short period construction, economical and beautiful advantages, easy to install.We use Steel structure materials strictly according to clients needs:H steel section is welded by automatic streamline at the plant, is connected on site by high strength bolts. It can be made into structure of gabled frame or frame. The architecture type focuses on single storey and multi-storey, one span or multi-span. And the span can be selected by users with different using demands within the design specification. It is mainly used in structures of industrial factory building, furniture city, supermarket, lobby and hall, multi-story residence, multi-storey office building, interface floor of building, etc. This structure is of quick construction, saving space, of high recovery rate and is environmental friendly.
5th point,We could design, manufacture, and export following kinds of metal structure (light steel structure) products:
1) Metal structure series, such as Portal Steel Frame, Tower construction, Steel roof truss
2) Chain structures series, such as Flat chain, Arc chain, Curved surface chain Net-shell Construction
3) Membrane structure (Fabric structure)
4) Trussed structure
THIRD PART,THE DETAILS OF STEEL BUILDING:
A)No sandwich panel siding we are going to use concrete block
B)Change roof to 26 ga galvalume not the sandwich insulated panel
C)on column line number 1 put 6 overhead roll up garage doors 12ft wide by 16 ft tall and one 4 ft by 8 ft man door
D)Column line 13 will be the other end of the building when you reduce it to 300 ft long
E)Between column 8 and 9 put support steel and decking for second floor office. We will pour concrete
F)On column line A and G between columns 9 and 10 put a 12ft by 16ft overhead garage door (That will be 2 one each side of building)
G)Design building for 20 lb roof load in case we put anything extra on the roof or hang from ceiling
H)On column lines A and G put 4 man doors on each wall 4Ft by 8ft
I)Need 6 roof or wall openings for exhaust fans
FOURTH PART,
1ST because of our steel structure welding technology meet Australia welding standards:
AS1163-1991 Grade C350 LO/C450 LO
BoxSection 89mm x 89mm x 3.5mm(thickness)
also gavanized(hot dip zinc coated) to AS/NZS4792(galv. Coating)
we have exported our steel structure factory buildings to Australia and New Zealand countries and regions rugularly.
3rd Project:Steel structure Aircraft maintenance hangar facilities
Location:Guangdong,China
Building type:aircraft maintenance hangar facilities
Construction area: 114421m2
Weight: 9513.09 metric ton
Layout(PDF):
Structural steelwork description:
New airport aircraft maintenance hangar facilities is locaed in South Area of New airport,total construction area is 114421m2,construction area of steel structure building is 23100m2,total structural steelwork consumption is 9513.09 metric ton,it is one of the biggest aircraft maintenance hangar facilities for span and covered area during finished and undertaking hangar facilities.
The main construction characteristics and difficulties:
1. Huge hoisting area:the total hoisting area covered is 250m×88m,it is the biggest single building,using integral hoisting techniques to hoist in one time currently in CHINA.
2. Big hoisting weight,big span:the weight reaches 4432t,clear span in the structure is 150m,they are both rare in the similar steel construction projects.
3. Much more Hoisting point-positions:totally 13 hoisting point-positions,32 lifting jacks,the maximum capacity of jacks is 360t.
Packaging Detail:1.container of 40'OPEN TOP,inside capacity is 12.01mx2.33mx2.15m,Gross weight of allocation is generally 27.0 tons,volumn is 60m3. 2.container of 40 feet HIGH CUBE:Inside capacity is 11.8m x 2.34m x 2.18m,Gross weight of allocation is generally 22 ton,volumn is 54m3. 3.HC container of 45 feet:Inside capacity is 13.58m x 2.34m x 2.71m,Gross weight of allocation is generally 29 ton,volumn is 86m3 |
Delivery Detail:25 days after recieving deposit payment |