steel structure warehouse
Steel structure workshop/building, 1. Certificate:ISO9001:2000 & CE(DIN18800), 2. High construction efficiency, 3. Economic cost - details see: https://www.buildingsupplieshub.com/steel-structure-warehouse-10040111
Place of Origin: Shandong China (Mainland) | Brand Name: JDCC | Dimensions: 100 SQM to 100000 SQM | Standard: ASTM, BS, DIN, GB, JIS |
Grade: Q235, Q345 |
Name | Specification |
Length | Single slope, double slope, muti slope, it's depend on the supplier |
Width | Single span, double-span, Multi-span, it's depend on the supplier |
Height | single floor, double floors, it's depend on the supplier |
Column | Q235, Q345 welding H section steel |
Beam | Q235, Q345 welding H section steel |
Purlin | Q235 C channel or Z channel |
Knee brace | Q235 angle steel |
Vertical and transversal support | Q235 angle steel, round bar or steel pipe |
Tie bar | Q235 steel pipe |
Brace | Q235 round bar |
Cladding system | sandwich panels (EPS, PU, Fiber glass wool etc.) or can use corrugated steel sheet with fiber glass wool insulation and steel wire gauze. |
Partition wall | sandwich panels (EPS, PU, Fiber glass wool etc.) |
Ventilation: | ventilator |
Door | sandwich panel sliding door or roller door |
Gutter | stainless steel or color steel sheet |
Rainspout: | PVC |
Live load on roof | In 120kg/Sqm (Color steel panel surrounded) |
Wind resistance grade | 12 |
Earthquake-resistance | 8degree |
Structure usage | Up to 50 years |
Our Mian Range:
1. Steel Structure Materials:
a, H Beam, C Beam and Z Bea
b, Galvanized Corrugated Steel Sheet
c, Sandwich Panel: EPS,PU and Mineral wool filled
a, H Beam, C Beam and Z Bea
b, Galvanized Corrugated Steel Sheet
c, Sandwich Panel: EPS,PU and Mineral wool filled
2. Prefabricated Steel Structure Frame
3. prefabricated house /Workshop /Large-Scale Factory, Car Garage, Hanger
4. All kinds of Contianer house
5. Pre-design light steel Villa.
Project Show As Follow:
Packaging Detail:(1) packing the pipes into the bundles by the steel strip (2) packing the welded steel structure parts by some fabric (3) packing the small parts by bags and EPS foam (4) packing sets parts by some box |
Delivery Detail:15 days after the deposite |