Steel structure prefab 5 star hotel luxury prefabricated beach hotel - #41005

1. Prefabricated beach hotel, 2. Well predesigned & pre-engineered, 3. Steel structure prefab 5 star hotel, 4. Quick assembled - details see: https://www.buildingsupplieshub.com/steel-structure-prefab-5-star-hotel-luxury-prefabricated-beach-hotel-10043497
Place of Origin: Shanghai China (Mainland)Brand Name: LYLUXModel Number: #41005Star class: 3,4,5 star class
Interior: luxuryDesigning: plan providedStructure: steel frame structure 
Steel structure prefab 5 star hotel luxury prefabricated beach hotel
contact supplier for Steel structure prefab 5 star hotel luxury prefabricated beach hotel


OVERVIEW
Building TypeSteel structure prefab 5 star hotel luxury prefabricated beach hotel
Style No.LYLUX #41005
Steel StructureSteel structure frame
Construction AreaCustomized design
StoreyCustomized design
Interior decorationLuxury
Star ranked3,4,5

INTRODUCTION

Multi-storey steel frame structure consists of beams and columns from welded H-shaped steel, hot-rolled

H-shaped steel. In this frames, the beam and column system takes the gravity load such as dead and live

loads. Now steel frame structure is mostly used for residential, commercial, institutional buildings all over

the world.

In developed countries a very large percentage of multi-storey buildings are built with steel structure. Steel

is not so commonly used in construction of multi-storey frame, but it is a better material than reinforced

concrete. The use of steel in multi-storey building construction results in many advantages for the builder

and the user.

STRUCTURE SKETCH

FEATURE

Green - Green frame, Green building materials.

Safe - Anti-seismic, anti-fire, anti-corrosion.

Durable - Galvanized high-strength steel frame.

Quality - We provide top-quality China made prefabricated steel buildings and accessories.

Cost - We pride ourselves in the fact that we always show our customers the best and least expensive way to

accomplish their project.

APPLICATION

MAIN COMPONENTS
Main FrameH-section steel for beam and column
MaterialQ235, Q345
Steel Thickness2mm-30mm
ConnectionChemical bolts/Screws

Floor System

Floor base board+floor sheathing
Steel deck with concrete slab+floor sheathing
Cold-formed steel frame+floor base board+floor sheathing

Exterior Wall System

Wall base board+insulation+wall cladding
Cold-formed steel frame+wall base board+insulation+wall cladding
Interior Partition WallCold-formed steel frame+insulation+gypsum board

Roof System

Roof base board+insulation+roof covering
Cold-formed steel frame+insulation+roof base board+roof covering
CeilingFloor frame+ceiling board
WindowsPVC/Aluminum alloy/Plastic-steel
DoorSteel/Wooden/PVC/Composite
Electrical and PlumbingChinese standard
Interior DecorationSimple/Normal/Luxury
OtherKitchen/Bathroom/Electric equipment

HOW TO BUILD

ABOUT MANUFACTURE

PACKING & LOADING

DESIGNING TECHNIQUE NOTES

Materials: Steel grade should be Q235B or above.

Frame life time: Normally over 50 years.

Loads: Wind load, snow load, dead load, live load, seismic load, etc. according to project local environment status.

Unit transport length: ≤ 12m

Pre-punched: Pre-punched on column, beam and purlin in the factory.

Connection: Q235 high strength anchor bolts for foundation and frame join point.

Foundation: Pre-embedded parts on accurate position.

Pre-assembly: Before shipment, it should be pre-assembly in our factory.

Rust cleaning on steel surface: Rust removed by hand is not permitted.

Anticorrosion treatment: Zinc galvanized or painting. Galvanizing thickness should be no less than 15μm.

Painting: 2 primer painting (epoxy resin primer), 2 finish painting (alkyd resin paint) on steel.

Fire resistance: Normally 4 hours for column, 4 hour for beam.

Wall surface: Decide what kind of materials according to local environment.

Roof surface: Decide what kind of materials according to local environment.


LYLUX SERVICE

1. Consulting

2. Architectural Design

3. Building Materials Solution

4. Manufacturing

5. Construction

6. After service

Please refer to LYLUX website for more service details…

Packaging Detail:Packed in 40' HQ container
Delivery Detail:60 days after receiving deposit

Related Product for Steel structure prefab 5 star hotel luxury prefabricated beach hotel