Special Mobile Scaffold - QS-QSS046
Place of Origin: Shanghai China (Mainland) | Brand Name: QS | Model Number: QS-QSS046 | Certificate: CE,ISO9001:2008 |
Type: Stage | System: Ring lock system | Material: Q235 tube | Diameter: 48*3.5mm / 42*2.3mm |
Surface: Galvanized |
Formwork
1.Certificate:CE,ISO9001:2008
2.Material:Q235 tube
3.Diameter:48*3.5mm, 42*2.3mm
This picture is a big and beautiful stage set up by our Ring lock system scaffolding in front of the China Pavilion inEXPO 2010 Shanghaito a republic conference.
1. Light and fast
It can be built quickly, easily and has a strong mobility, which meets the need of a wide range of operation.
2. Flexible, safe and reliable
You can build a variety of specifications, multi-bay moveable scaffold depending on your actual needs, all kinds of perfect safety accessories, providing you with a solid, secure support in your operating.
3. Convenient in storage and transportation
Small demolition storage area and convenient move by push, the convenient transfer of components can pass through a variety of narrow channels.
Ring lock system scaffold components
Name | Model No. | Size |
Ledger | QHG-090 | 900mm |
QHG-120 | 1200mm | |
QHG-150 | 1500mm | |
QHG-180 | 1800mm | |
Standard | QLG-120 | 1200mm |
QLG-180 | 1800mm | |
QLG-2400 | 2400mm | |
Diagonal | QXG-201 | 900×1800 |
QXG-202 | 1200×1800 | |
QXG-203 | 1500×1800 | |
QXG-204 | 1800×1800 |
Compare features of scaffolds
Item | Fastener tube scaffold | Cup lock scaffold | Ring lock system scaffold | |
Component | Tube, fastener | Standard, Ledger | Standard, Leger, Diagonal | |
Force style | Friction, Shear | Axial load | ||
Reliability | Free frame node, diversity, low reliability | Fixed size component, steady structure, high safety. | ||
Flexibility | Size of frame is flexible | In spite of limit by fixed size, the frame is quite flexible. | ||
Load | Bay × lift × width | 0.6m × 0.6m ×1.5m | 0.6m × 0.6m ×1.5m | 0.6m × 0.6m ×1.5m |
Load of standard | 1.7T | 2.5T | 2.8T | |
Erection efficiency | 1 | 3 | 4 | |
Wastage rate | 10% | 5% | 2% | |
Conclusion | Flexible frame, low reliability, excessive material, huge wastage more manpower and low efficiency | Standard structure, low flexibility, high reliability, low wastage, high efficiency. | Standard structure, High load capacity, high reliability, low wastage, high efficiency |
Packaging Detail:Galvanized Other packing information will be in accordance with your demands. |
Delivery Detail:20 working days after received the deposit of L/C or T/T. |