soundproofing cork flooring - RS-PHXD018
Cork flooring, 1. Material: natural cork, 2. Size: 915 x 305 x 11mm or customize, 3. Prepainted, 4. Ideal for bedroom,office etc - details see: https://www.buildingsupplieshub.com/soundproofing-cork-flooring-10072740
Type: Cork Flooring | Place of Origin: Zhejiang China (Mainland) | Brand Name: Rosen | Model Number: RS-PHXD018 |
Surface Treatment: Stained | surface: stained |
soundproofing cork flooring
1. Details descriptions
Item | Cork Floating Tiles | |
Size | 915x305/195/145/113x11mm (Unilin Click system) | |
Structure | 3mm top cork layer 7mm HDF E1 Class 1mm cork backing sheet | |
Surface | Wear 3 coats of water-based PU varnish | |
Cork Density | Wear layer 500kg/m3 (30lb/ft3) – Underlayment | |
Impact sound absorption | approx. 14dB | |
Thermal resistance | approx.0.129m 2K/W | |
Test standard | SGS, ECO, EC and CARB | |
Wear resistance | with the Taber Abrasion method – Wheels | |
Packaging | 7 planks per pack or 1.9535 sq m 48 packs per pallet(915x305x11 mm) |
2. Technical specifications:
Technical specifications
Test item | GB/T4100.1-2010 | Test result |
Length tolerence | Length | 599.7~600.0 |
Side straight | ±0.2 | -0.04~ +0.05 |
Right angle | ±0.2 | -0.05~ +0.04 |
Surface Flatness | Center curvature | -0.04~+0.04 |
Surface quality | A minimum of 95% of the tiles shall be free from visible defects. | No visible defects |
Water absorption | Mean value E≤0.5 | 0.08 |
Breaking pressure | When the thickness is ≥7.5mm, the average shall be ≥1300 | 1764.6 |
Modulus of rupture | Mean value≥35 | 37.2 |
Luster degree | ≥ 55 | 70-73 |
Abrasion resistance | ≤ 175 | 131 |
Resistance to frost | No crack or peeling. | No |
Resistance to Household Chemical Reagent | Not lower than UB level | UA level |
Resistance to Chemical of swimming pool | Not lower than UB level | UA level |
3. Application space:
Meeting room, Library, Office, Bedroom etc.
4. Certified by:
SGS,CARB,CE,VOC
Packaging Detail:7 planks per pack or 1.9535 sq m 48 packs per pallet(915x305x11 mm) |
Delivery Detail:20 days after confirming advance payment |