slab painted construction concrete scaffold steel metal formwork for columns building - HX013

metal formwork, MateriaL:ASTM45#,Q235, Certificate:ISO9001:2008, Shape:F type flattening - details see: https://www.buildingsupplieshub.com/slab-painted-construction-concrete-scaffold-steel-metal-formwork-for-columns-building-10073802
Place of Origin: Tianjin China (Mainland)Brand Name: ADTOModel Number: HX013material: 45#,Q235
surface treatment: paintedwidth: 100-300mmheight: 55mmAccessories: Flat Tie,Wedge Pin,Pipe Hook,Tie bolt
Application: Concrete for construction   
slab painted construction concrete scaffold steel metal formwork for columns building
contact supplier for slab painted construction concrete scaffold steel metal formwork for columns building


metal formwork

Product Description

1. The material of formwork panel is Q235 steel plate, which has good stiffness and ductility, not easy to deform.

2. Compared with wooden formwork panel, steel formwork has a good waterproof property in preventing generating air bubble in concrete.

3. Smooth surface of steel formwork panel can work out a perfect concrete finish.

4. Fixed by screw or u fastener, this construction formwork panel can be quickly combined together piece by piece without limit.

No.Size(mm)Weight(kg/pc)No.Size(mm)Weight(kg/pc)
HF9018900*1800*5570.89HA001850*50*18004.34
HF9015900*1500*5559.47HA001550*50*15003.7
HF9012900*1200*5548.03HA001250*50*12002.94
HF6018600*1800*5543.1HE1515150*150*150015.2
HF6015600*1500*5536.3HE1512150*150*120012.26
HF6012600*1200*5531.7HE1509150*150*9009.34
HF5018500*1800*5536.27HY1018100*100*180014.56
HF5015500*1500*5530.15HY1015100*100*150012.29
HF5012500*1200*5525.55HY1012100*100*12009.72

Formwork

Packaging & Shipping

Package

Accessories

Company Information

Factory

Trade show

Packaging Detail:suitable for sea transportation
Delivery Detail:within 10-25 days

Related Product for slab painted construction concrete scaffold steel metal formwork for columns building