Side entry toilet fill valve - J2102

*Installation Position : Side, *Fill rate : 0.05MPa : more than 0.05L/S, *Pressure design,momentary shut off,anti-siphon - details see: https://www.buildingsupplieshub.com/side-entry-toilet-fill-valve-10017851
Type: Filling ValvesPlace of Origin: Fujian China (Mainland)Brand Name: ALYNModel Number: J2102
Plastic shank: G3/8" and G1/2"Color: White and blue  
Side entry toilet fill valve
contact supplier for Side entry toilet fill valve


Side entry toilet fill valve

*Installation Position : Side
*Fill rate : 0.05MPa : ≥0.05L/S
*Working pressure : ≤1.0MPa
*Pressure design,momentary shut off,anti-siphon
*Rotate float cup height to control water level

MaterialPOM
shank sizeG3/8" ; G1/2" Plastic shank
Suitable forWash-down and siphonic toilets
ColorWhite and blue
SamplesSamples are free ,but the freight should be paid by buyers.

Company information:

Production line:

Alyn use skilled workers to make sure the quality of production,

enough storage house to make sure the turnover of delivery.

Injection and mould equipment:

Alyn applies the most advanced tooling process equipment,

products most precise and high quality mould, to ensure the

stability of our products.

Testing area:

Life Test

Fill valve: After 250,000cycles no damage

Flush valve: After 75,000cycles no damage

High/Low pressure test machine

The highest dynamic pressure: 1.0Mpa and lowest dynamic

pressure: 0.02Mpa , No leakage !

Aging test

Anti-siphon test

Holding-pressure test

72 hours static pressure of 1.0Mpa, function normally.

Alyn make random holding-pressure for each shipment to make

sure quality of products to end user!



FAQ

Q1: What is your products range?
1) All fittings for toilet, fill valve, flush valve, push button, lever, bolts, etc.
2) Other bathroom fittings

Q2: How to inspect the finished products?
We inspect all the parts before assembling and 100% testing the fininshed product before packaging based on the ISO9001.

Q3: How many days will samples be finished? And how about the mass production?
Generally, 2-3days for samples making.
The lead time of mass production will depend on quantity. normally,We finish within 15 days

Q4: What kind of package you can provide?
Printing plastic bag,Printing plastic hang bag,Single or double blister with color card,Color box etc.

Q5: Why we choose to cooperate with you ?
We provide reliable quality, competitive price, high valued service to help you earn more market share. We will be your best partner.


Main Advantages of our company

1) More than 8 years R&D experience.
2) More patented new designs.
3) Modern facilities for manufacturing and quality assurance.
4) Professional to make mould for customers with competitive cost.
5) Customized color, package, design.
6) In-time delivery and professional service.
7) OEM service supported.
8) Catalog and free sample for design and quality check.

Packaging Detail:PE bag/Blister+color card/Color box up to your choice
Delivery Detail:About 10days

Related Product for Side entry toilet fill valve