Scaffoldings / Elevator / Gondola / Construction Working Platform - ZLP630

Construction Working Platform, 1.Experienced Technical Staff, 2.Quality Guarantee, 3.International Approvals, 4.Prompt Delivery - details see: https://www.buildingsupplieshub.com/scaffoldings-elevator-gondola-construction-working-platform-10080063
Place of Origin: Jiangsu China (Mainland)Brand Name: BalanceModel Number: ZLP630Material: Steel, Aluminum Alloy
Color: Red, Yellow, Blue, etcSurface Treatment: Powder coating, Hot galvanizationLength: 2m, 2.5m, 3m, 5m, 6m, 7.5m, etcPower: 1.5kw, 1.8kw, 2kw
Rated Loading Capacity: 150kg, 250kg, 500kg, 630kg, 800kg, 1000kgVoltage: Construction Working Platform accept different voltages:220V,380V,etcApplication: High-rise building, Large tank, Chimney, Dams, Bridges, Derrick, etcSpecial platform: Can be customized and supplied
Certification: ISO, CE   
Scaffoldings / Elevator / Gondola / Construction Working Platform
contact supplier for Scaffoldings / Elevator / Gondola / Construction Working Platform


Scaffoldings / Elevator / Gondola / Construction working platform

Breif introduction

ZLP Series temporarily installedScaffoldings / Elevator / Gondola / Construction Working Platformis climb-decoration electrical machinery, mainly used for high-level multi-storey buildings and the exterior construction and decoration and fitting-out works. For example: plastering pulp, veneer, the installation of curtain walls, and paint coatings, paints, as well as cleaning, maintenance, etc., can also be used for large-scale tanks, bridges and dams and other engineering operations.

Use of this product may be revealed scaffold-free, and greatly reduce the construction cost, efficiency improved greatly products operation simple and flexible, easy transfer, easy to use, safe and reliable.

Parts contains:

1. Suspended Cage: Steel or Aluminum Alloy (powder coating or hot galvanization)

2. Suspension Mechanism: Steel (powder coating or hot galvanization)

3. Electric hoists: LTD6.3 or LTD8

4. Safety Lock: LSF30

5. Electric control box: Schneider brand

6. Steel wire rope: 8.3mm or 9.1mm

7. Power cable: 2.5 mm²

8. Counterweights: Cement or Cast Iron

9. Spare parts

Parameters of Scaffoldings / Elevator / Gondola / Construction working platform:

ModelZLP250ZLP500ZLP630ZLP800AZLP800S
Material

Steel or Aluminum Alloy

Rated Capacity(kg)250500630800800
Lifting Speed (m/min)9-119-119-118-108-10
Motor Power (kw)LTD5LTD5LTD6.3LTD8LTD8
Platform Length (m)2.5567.57.5
Counterweights (kg)62575090010001000
Diameter of Wire rope (mm)8.38.38.38.68.6
Standard lifting height (m)100100100100100

Products photos:

Application:

1. High-rise building: Decoration, construction for external wall, installation of curtain wall and external components, repairing, checking, maintenance and cleaning for external wall

2. Large-scale project: construction, repairing and maintenance for large tank, chimney, dams, bridges, derrick

3. Large ships: welding, cleaning and painting

4. billboard: installation billboard for high-rise building

Quality Control & Packing:

Certificates:

Superiority:

1. We had already passed the authorization by ISO9001:2008 and CE and established a complete set of quality assurance system.

2. Under such a complete set of quality assurance systems, there is a complete set of regulations for ordering, order handling, quality design, purchasing raw materials, working out production plan, production, test and inspection, packaging, storage, delivering, trace, keep in touch with clients, etc.

3. The CNC control center and PC-based production and marketing system not only improves the working efficiency but also assures the products quality.

4. Our test lines are equipped with a large amount of online test instruments, so that they can ensure and improve the products quality.

5. We also have a complete set of equipment and techniques for testing and controlling the performance of products, which ensures our Scaffoldings / Elevator / Gondola / Construction Working Platform to take a leading position among the fellow products at home and reach the international standard.

Packaging Detail:Pallet, Plywood box, Steel strip, Containers available, according to the model and quantity.20'ft container put 9-10 sets and 40'ft container put 12-14 sets.
Delivery Detail:10-15 days upon receipt of the payment

Related Product for Scaffoldings / Elevator / Gondola / Construction Working Platform