Scaffolding System - GN50

1.GS ,CE ISO9001 certificate, 2.Flexible, efficient&safe, 3.Patent no welding design, 4.Light weight&space saving - details see: https://www.buildingsupplieshub.com/scaffolding-system-10079538
Place of Origin: Guangdong China (Mainland)Brand Name: LEADERModel Number: GN50Material: Aluminum alloy (6082)
Tube wall thickness: 1.8MM, 3.2MM;Pipe diameter: 50.8MM;Platform loading: 200KG per Square metersTOWER MAX LOADING: 1000Kg
Ladder: vertical,incline &stairway ladders are availableChina Patent: NO.ZL2007 1.0031801.4Certification: ISO9001&TUV's GS &CEConnection: Weld-free design
Features: Light-weight;Patent design   
Scaffolding System
contact supplier for Scaffolding System


Guangzhou Leader Equipment Ltd. will attend the BAUMA 2014 exhibition in ShangHai,China

ISO9001:2008 Certificated Guangzhou LEADER Mobile GN50 Weld-free Aluminium Scaffolding System

The first manufacturer gets GS certificate of curved frame in China.

This is our new designed product-Universal Aluminium Scaffolding. Its latest unique extraordinary multi-directional design, lightest weight, robust connecting joints, excepetionally great loading capacity, without height limitation, safe and speedy erection and dismanting features enable the system capable of being utilized on any indoor or outdoor space-constrained working environments with complicated scaffolding requirement.

Material: Aluminum alloy (6082)

Tube wall thickness---1.8MM, 3.2MM; diameter: 50.8MM

Leader GN50 Tubular Aluminium Scaffolding System is a revolutionary multi-directional scaffold system that comprehends the usages of aluminium tube and steel connectors having

exceptionally light weight while giving great load capacity.The design creates a new era for scaffolding,

it merges all distinctive features and outstanding functions to act as the Best Substitution to existing scaffolding

systems, such as traditional steel, aluminium and bamboo scaffolds etc.

1. Patented Weld-free design

The unique patented innovative design joint which excludes the downward movement of the connectors and

entirely eliminate the conventional welding method and changes the load distribution mode of traditional metal

scaffold.Meanwhile,tubular design enables faster,easier and safer for assembling .

2.Light Weight Components

Utilize light weight,sturdy aluminum material.Light weight component ,easy assembling,carriage and storage.

1/3 weight of traditional steel scaffolding without crushing the floor.

3. Safe and Stable Structure

High consecutive component,steady,scientific supporting structure design,entirely safe and stable.

Thermocompression technology,The destruction of the scaffold joint pulled off force reach to 4100-4400 kg,more than 2100kg.12 meters double width scaffolding loading capacity reach to 500KG.

The average loading capacity of each platform is 200kg//M²,whole tower loading capacity is1000kg

4. Easy to move

High strength castors with brakes,which can be easily moved and locked to support continuous

Use at many different working places.

5. Free to work

Waterproof and anti-slip work platform,it can be erected as tall as user’s requirement,

it also be used at uneven ground.

6. High suitability

The adjustable legs can be used on stage,stairway and other complex environments,

by polyurethane castors it can avoid marble,wood floors and lawns or other damage to the scaffolding on ground,

it can pass,be erected and used in and out of tight spaces(such as elevators,doors,etc)structures and operations,with diverse types and beautiful appearance.

7. Flexible structures for setting up

We can supply the special designed products according to the customers’ different maintenance

or working needs of the terrain environments.

8. Anti-corrosion ,maintenance free

All components are added special anti-oxidation treatment,it will not be rusted or corroded by chemical,it can work more than 10 years without maintenance.

9. Ladder types

Leader aluminum scaffolding systems have vertical ladder,inclined ladder and stairway to be equipped with.

One of the sucessful projects of LEADER--- 35m High

Packaging Detail:Ex-factory price-Bare package FOB-Steel base plus normal package
Delivery Detail:30 working days

Related Product for Scaffolding System