Ring Lock Scaffold - QS-RP001
Place of Origin: Shanghai China (Mainland) | Brand Name: QS | Model Number: QS-RP001 | Type: Scaffolding Parts |
Scaffolding Part Type: Scaffolding Frames | Certificate: CE,ISO9001:2008 | Material: Q235, Q345 tube | Diameter: 48*3.5mm / 42*2.3mm |
Surface: Hot Dip Galvianized | System: Ring lock system |
Scaffolding
Features
1.diameter :48*3.5mm,42*2.3mm;
2.material :Q235 tube;
3.Certificate :ISO9001:2008,CE;
The advantage of theRing plateare as follows:
1.Material saving,The edge of Ring Plate is incurvated a right angle to the plane,which makes the frame has enough strength and also helps to save materials.
2.Ring Plate design,The holes ars settled on plate symmetrically.The hole for ledger is narrow because the ledger is the main component to be pressed.The hole for diagonalis bigger because it can keep some flexibility to connect the diagonal or ledger for curve.
3.Wedge Design,Separate self-locking wedge system adopted makes the wedge hard to loose because of self-lock and gravity,even if wedge was not stricken tightly.
4.Paint or Plating,The galvanized or paint finish will greatly last the life of the products,no more rust or corrosion.
5.Products with standard specification,standard size and series,convenience for erection.
Usage:
1.Municipal bridge, tunnel construction, in-situ flat-slab at the end of model support are especially suitable for early removal template support system construction.
2.Building internal and external construction, decoration, especially the big space, high-altitude platform;
3.Large-scale equipment pipe (tank) installation and maintenance industry, power generation, iron and steel industry, blast furnace, chimney and pipeline maintenance.
4.All kinds of performing arts, exhibition, sporting event of the provisional stage, bleachers, special variety of athletic frame, large scoreboard, large TV screen frame, lighting shelves, etc.;
5.Scaffolding leasing business;
6.The shipbuilding industry, military, civil aircraft maintenance industry assembly
7.Outdoor billboard dismantling ,high-level roof facilities repairment;
8.Shed room, scaffolding, storage shelve puts up and so on.
Packaging Detail:20 GP:13-19 tons; 40 GP:20-24 tons; 40 HQ:25-26 tons; Galvanized; Other packing information will be in accordance with your inquiry. |
Delivery Detail:30 working days after received the depoist or L/C; |