prefabricated apartment/steel villa to Australia

Recognized quality with competitive price., Easy to assemble and dismantle., Long using time up to 50 years - details see: https://www.buildingsupplieshub.com/prefabricated-apartment-steel-villa-to-australia-10038831
Place of Origin: Guangdong China (Mainland)Material: Q235Surface finish: hot dip galvanizedSteel sections: H beam,I beam,angle, square tube,channel etc
prefabricated apartment/steel villa to Australia
contact supplier for prefabricated apartment/steel villa to Australia


Advantage:
1, Protect forest resources
2, Protect environmental, do not produce harmful material
3, Prevent fire and insect.
4, Good shock resistance ability
5, High quake-proof, water proof and fire proof
6, Short construction time
7, Fast construction, save time and labor cost
8, Prefabricated and customized design
9, High space efficiency
10, Life time: Over 25-50years
11, Good safety performance.
12, Nice appearance

Our service:
-Quotation according to yours drawing
-Design and quotation according to yours requirements
-Delivery the entire steel building to you by containers;
-Offer all the detailed drawings for installation and fabrication.


We are manufacturer of various steel structure building, like warehouse, workshop, houses etc.

Main StructureWelding H Steek
PurlinC section Channerl or Z section channel
Roof CladingSandwich Panel or Corrugated Steel Sheet wirh Fiber Glass Wool Coil
Wall CladingSandwich Panel
Tie RodCircular Steel Tube
BraceRound Bar
Column Bracing and Transverse BraceAngel Steel or H Section Steel or Steel Pipe
Knee BraceAngel Steel
Roof RidgeCorrugated Steel Sheet
Wrapping CoverColor Steel Sheet
Roof GutterColor Steel Sheet
RainspoutPVC pipe
DoorsSliding Sandwich Panel Door or Metal Door
WindowsPVC or Aluminum Windows
ConnectionHigh Strength Bolts

The information we need you offer if you want our design:


NameSteel Structure Building
SizeL*W*H/ Ridge Hight/Slope
UsageWhat will the building be used in
CountryWhich country the building will be
Design LoadWind Speed/Snow Load/Earthquake
Wall and RoofPanel or Steel Sheet
InsulationSandwich Panel/Fiber Glass/Rock Wool/PU
SurfaceHot DIP Galvanize or Painted
WindowQuantity/Material/Dimension(W*H) and Position
DoorQuantity/Material/Dimension(W*H) and Position
AccessoriesDown Pipe/Gutter/Ventilator/Skylight ect/
Please don't hesitate to contact us to ask a price for reference if you have any structure project on hand.

And the following photo is making pallet status before loading.

Packaging Detail:In bulk or put all the components on steel pallet.
Delivery Detail:Within 30-45days after confirm drawing and receipt 30% deposit

Related Product for prefabricated apartment/steel villa to Australia