Powder coated blue H scaffolding frame - JC-FS

1. reliable quality, 2. reasonable price, 3. factory direct supply, 4. easy installation, 5. promptly delivery - details see: https://www.buildingsupplieshub.com/powder-coated-blue-h-scaffolding-frame-10079549
Place of Origin: Anhui China (Mainland)Brand Name: JCModel Number: JC-FSmaterial: Q235/Q345 steel
surface finish: HDG; Electro-plated; Powder coated;Paintedcommon size: all sizes are availablecertification: ISO9001color: Blue
Powder coated blue H scaffolding frame
contact supplier for Powder coated blue H scaffolding frame


BLUEPOWDER COATED FRAME

1.69'' outside steel tube diameter,1-1/2'' inside steel tubing diameter, 0.095'' wall thickness.

2.material: Q235 steel

3. fuction: support

4.color: blue,yellow, red or as your like

5.surface treatment: powder coated, HDG,electro-plated,painted etc.

6.size: 60'x60', 60' X30' or sizes as your need

7.customer's sizes are also available.

8. the width is measured by center to center of tube.

Scaffolding frame is a temporary structure used to support people and material in the construction or repair of buildings and other large structures.

HeightWidthStud CerterWeight(lbs)
2'5'1'23
3'5'2'26
4'5'3'35
5'5'4'37

we are expertised scaffolding manufacturer in China near 10 years, our products sell better in north & south American, southeast Asia, india and so on, including ringlock, cuplock, kwikstage, frame system, screw jack, steel plank, props, side bracket, caster wheel and couplers.

WELCOME TO VISIT OUR FACTORY!

Item

Frame scaffolding

System

Frame system

Material

Q235,Material is as per customer’s demand with high tensile strength and yield stress

Surface treatment

Powder-coated

Color

blue

Size

OEM service

Customer’s size is also available

Certification

ISO900:2008, SGS

Main market

America, South Asia, West Europe, etc

Advantages

Superior quality

Easy installation

Competitive price

Standard package

Promptly delivery

Minimum Oder

One container

Supply ability

25 container per month

Port

Nanjing/Shanghai

Currency

USD

Payment

L/C, T/T 30% in advance

Package

Pallet, safe and standard package

Packaging Detail:steel pallet, safe & standard package
Delivery Detail:30-40 days after the order confirmed

Related Product for Powder coated blue H scaffolding frame