Plant Steel Structure - KB-PL01

Power Plant Building Structure, Pipe rack, HRSG None pressure part. (Duct, Casing) - details see: https://www.buildingsupplieshub.com/plant-steel-structure-10039817
Place of Origin: Jeollabuk-do South KoreaBrand Name: KB Heavy IndustriesModel Number: KB-PL01 
Plant Steel Structure
contact supplier for Plant Steel Structure


1. Fabrication range : Power Plant Structure , HRSG Structure, AFC Structure, ACC Structure,

Duct, Pipe Rack Structure.

2. Application code and standards : AWS, ASTM & Etc'

3. Design Press : None Pressure parts

4. Design Temp : As per data sheet & Project Spec.

5. Performance : Building Structure & Pipe rack - 1000ton / Monthly,

AFC, ACC-500ton Monthly, HRSG Duct, Casing - 300ton/ Monthly.

6. Work Procedure

(1) Purchase of Materials & Material Inspection

(2) Plate, Shape steel Cutting & Matchining

(3) Production of Built - up Beam.

(4) Fit-up, Welding & Inspection ( Included NDE)

(5) Pre-Assembly ( If Required - ex) AFC, ACC)

(6) Coating & Cleaning ( Paint or ACID Cleaning & HDGV)

(7) Export Packing & Delivery is FOB from Korea.

7. Delivery Period (Average)

(1) Less than 500ton : Within 2 Months after receiving the advance payment.

(2) 500ton ~ 1000ton : Within 3 Months after receiving the advance payment.

(3) 1000ton ~ 2000ton : Within 4 Months after receiving the advance payment.

(4) More than 2000ton : Start after 3month - 1000ton / monthly.

Packaging Detail:Standard export package.
Delivery Detail:Within 3~24 month after receiving the advance payment.

Related Product for Plant Steel Structure