Moveable Container House - Container house
Place of Origin: Beijing China (Mainland) | Brand Name: CDPH | Model Number: Container house | ISO Quality Certificate:: ISO9001:2008 |
ISO Environment Certificate:: ISO14001:2004 |
Container House
Galvanized structure. Good anti-rust ability and long endurable time.
Can be delivered directly as flat packs, Save renting shipping containers fee.
Can be transported by truck or crane Save disassembling and reassembling troublesome.
Easy installation, Save labor cost.
Recycle use, Save each project's accommodation cost.
The detailed information as follows:
No. | Sort | Name | Specification | ||
1 | Specification | length | 6055mm | ||
2 | Width | 2435mm | |||
3 | Wall height | 2790mm | |||
4 | weight | 2000KGS | |||
6 | Standard accessory | Wall | 75mm glass wool sandwich panel, 0.4mm color steel sheet and 60kg/m3 glass wool density inside. | ||
7 | Roof | Outside is 0.5mm color steel as the surface, middle is 75mm glass wool insulation. Inside is 9mm melamine board. Permitted live loading:1.5KN/m² | |||
8 | Base | External wainscot is 0.3mm galvanized steel sheet metal, and insulation is glass wool. The supporting material is 16mm cement board and the inside decoration is 2mm rubber plastic flooring. Permitted loading: 3.0KN/m2 | |||
9 | Door | Steel door, single door with dimension of 800*200mm, furnished with lock. | |||
10 | Window | 1) PVC sliding window, white color, with dimensions of 900*1100mm; Supplied with fly screen. 2) PVC casement window, white color, size is 700*1000mm. Supplied with fly screen. | |||
11 | Post | Galvanized steel, material: Q345-Q235, 3mm thickness. Connection part is M12 high strength bolt. | |||
12 | Option | Drainage system | Provided plan, design and construction | ||
13 | Electric system | Provided plan, design and construction | |||
15 | Technical parameter | Resistant temperature | -20°Cto 50°C | ||
16 | Wind load | 11 grade | |||
17 | The resistant earthquake grade | 7fission activate. |
Packaging Detail:Flat packaing. |
Delivery Detail:within 25 days after receiving the 30% advance payment |