light gauge steel furring frame keel for interior wall and exterior wall - type:steel frame
A.cold-formed galvanized rolled plate, B high strength and good rigidity, C.It is easy to installation, D. ariety type - details see: https://www.buildingsupplieshub.com/light-gauge-steel-furring-frame-keel-for-interior-wall-and-exterior-wall-10030407
Type: Ceiling Grid Components | Place of Origin: Shanghai China (Mainland) | Brand Name: hhchina aigo | Model Number: type:steel frame |
material: galvanized steel | usage: Hotel,House,Toilet,Villa | main structure: C-shape and U-shape steel keel |
light gauge steel furring frame keel for interior wall and exterior wall
Products Description
A. Made of excellent cold-formed galvanized rolled plate and with uniform material, high strength and good rigidity, steel joist enjoys perfect construction performance. With good rust-resistant and corrosion resistant performance, it is galvanized on both sides and prior to Chinese standard for high-class product. |
B. Adopting multi-roll production technology, ensuring steel strap’s gradual deformation, full release of main stress and uniform distribution of remaining stress can effectively prevent the ceiling gypboard joint from crazing. |
C. Automatic production line for steel furring’s cutting at random and ECV servo technology will ensure the dimension accuracy. |
D. It is very easy to drive in and saves time while installing |
E. We not only have great variety of steel furring, including all the kinds in the market, but also produce the ones based on customers’ requirements. |
Payment: we usually accept T/T,L/C, D/P, D/A, OA, please send email to negotiate payment term if you can not accept T/T or L/C
Delivery Time:
Design stage: 3 to 10 days after receive
LGS Frame manufacturing lead time: 15-30 days 40% deposit
Pre-assembly time: 3~7days
For urgent order, Could be faster, please send email to negotiate
How to make an order?
1. Make house design (or to choose from the design collections)
2. Manufacture the LGS steel frame, purchase other materials from cooperative-companies
3. Make pre-assembly ( if required)
4. Inspection
5.Arrange shipment
Packaging Detail:general package for light gauge steel furring |
Delivery Detail:30days for light gauge steel furring |