LEADER GN50 Aluminium Scaffolding System - GN50

Compliance to EN1004,EN12810 & EN12811(CLASS IV),GS & CE Certification. - details see: https://www.buildingsupplieshub.com/leader-gn50-aluminium-scaffolding-system-10079283
Place of Origin: Guangdong China (Mainland)Brand Name: LEADERModel Number: GN50Material: Aluminum alloy (6082)
Tube wall thickness: 1.8MM, 3.2MM;Pipe diameter: 50.8MM;Platform loading: 200KG per Square metersTower MAX loading: 1000Kg
Certificate: TUV's GS&ISO 9001Patent: NO.ZL2007 1.00318014Application: suspended&cantilever & tower scaffolding9: ISO 9001
10: CE Certification   
LEADER GN50 Aluminium Scaffolding System
contact supplier for LEADER GN50 Aluminium Scaffolding System


Guangzhou Leader Equipment Ltd. will attend the BAUMA 2014 exhibition in ShangHai,China

ISO9001,TUV's GS Certificated Guangzhou LEADER GN50 Aluminium Suspended Scaffolding System

Leader GN50 Tubular Failsafe Aluminum Scaffolding System is an innovative breakthrough technology

adopting all the distinctive features for ideal scaffolding with unlimited prominence performance.

Compliance to EN1004,EN12810 & EN12811(CLASS IV),GS & CE Certification.

Key Features

1 Weld free tubular design

2 Genius fail-safe rosette connector

3 Vertical standard protection at node

4 Light weight for heavy duty 200 KG/m2

5 Dexterous components

6 All-round multi-directional design

Prominent Performances

1 Swiftest working speed with highest productivity

2 Most sturdy structure & Top safety

3 Compact space save storage & transport cost

4 Supreme versatility

5 Best transverse resistance at joints

6 Anti-Rolling on floor

7 Lowest labor fatigue and involvement

8 Highest cost effectiveness

Basic components & accessories

Horizontal braces

Diagonal braces

Lever brace

Optional Aluminium Toeboards

Adjustable Leg

castor

Base Plate

U Clip

Spring Clip

Stablilizers

Tube wall thickness: 1.8MM, 3.2MM; diameter: 50.8MM

***Φ48.3×3.2 / Φ48.3×4.0 / Φ50.8×3.2 are available on request to support heavier loading.

Its applications, usage and cost-effectiveness overwhelm those of traditional scaffoldings which made of bamboo, wood, steel, or aluminum. It is the best choice to replace the traditional scaffoldings.

Without employing extra special accessories, workers can easily and efficiently assemble or dismantle the cantilever scaffold platform:

Compare with Leader Formwork System:


Packaging Detail:Ex-factory Price-Bare Package FOB-Steel base plus normal package
Delivery Detail:30 working days

Related Product for LEADER GN50 Aluminium Scaffolding System