Landfill HDPE geomembrane with smooth surface - CJ/T 234-2006
Type: Geomembranes | Place of Origin: Shandong China (Mainland) | Brand Name: starring | Model Number: CJ/T 234-2006 |
Material: HDPE,LDPE,LLDPE,PVC,EVA | thickness: 0.2-4mm |
Landfill HDPE geomembrane with smooth surface
Landfill HDPE geomembrane with smooth surface introduction:
HDPE Geomembrane is a waterproof membrane made by poluthylene/PE,PVC and other geomembranes.after the process of calendering,spreading and rolling you will get the geomembrane.
Landfill HDPE geomembrane with smooth surface applacation range:
HDPE geomembrane is typically used in landfill,animal waste lagoons.
HDPE Geomembrane is an excellent product for large applications that require UV and Ozone resistance, chemical resistance or high-quality installations.
HDPE Geomembrane materials are a cost effective choice for exposed lining projects.
Landfill HDPE geomembrane with smooth surface Technical parameter:
Properties | Test method | GM 075 | GM 100 | GM 125 | GM 150 | GM 200 | GM 250 | GM 300 |
Thickness | D5199 | 0.75mm | 1.00mm | 1.25mm | 1.50mm | 2.00mm | 2.50mm | 3.00mm |
Density | D1505 | 0.940 | 0.940 | 0.940 | 0.940 | 0.940 | 0.940 | 0.940 |
Tensile properties 1. Yield strength 2. Breaks strength 3. Yield elongation 4. Break elongation | D6693 Type IV | 11KN/m 20KN/m 12% 700% | 15KN/m 27KN/m 12% 700% | 18KN/m 33KN/m 12% 700% | 22KN/m 40KN/m 12% 700% | 29KN/m 53KN/m 12% 700% | 37KN/m 67KN/m 12% 700% | 44 KN/m 80 KN/m 12% 700% |
Tear resistance | D1004 | 93N | 152N | 156N | 187N | 249N | 311N | 374N |
Puncture resistance | D4833 | 240N | 320N | 400N | 480N | 640N | 800N | 960N |
Stress crack resistance | D5397(App.) | 300hr | 300hr | 300hr | 300hr | 300hr | 300hr | 300hr |
Carbon black content | D1603 | 2.0% | 2.0% | 2.0% | 2.0% | 2.0% | 2.0% | 2.0% |
Oxidative induction time (OIT) | D3895 | 100 min | 100min | 100min | 100 min | 100min | 100min | 100min |
Pls feel free to contact us:
Packaging Detail:pp woven bag or based on consumer's requirements |
Delivery Detail:in 10 days after receiving the deposit |