JDCC- two-story prefab steel structure buliding

Steel structure workshop/building, 1. Certificate:ISO9001:2000 & CE(DIN18800), 2. High construction efficiency, 3. Economic cost - details see: https://www.buildingsupplieshub.com/jdcc-two-story-prefab-steel-structure-buliding-10039826
Place of Origin: Shandong China (Mainland)Brand Name: JDCCDimensions: 100 SQM to 100000 SQMStandard: ASTM, BS, DIN, GB, JIS
Grade: Q235, Q345   
JDCC- two-story prefab steel structure buliding
contact supplier for JDCC- two-story prefab steel structure buliding


The advantage of steel structure workshop:

Product Description:
The load bearing parts for steel structure workshop are mainly steel structures, including steel columns, steel beams, steel structural basements, bracing systems for wall and roof. Steel workshops are divided into Light Steel Workshops and Heavy Steel Workshops. The Main Structure are usually made of Q345 Steel while the Purlins and Bracing System are made of Q235 Steel. They are the most common steel materials used for steel structure in China.
Advantages of Steel Structural Workshop:
1).Large span for great strength with light deadweight;
2).Short finishing time and low cost;
3).Fire proof and rust proof;
4).Convenient to assemble or disassemble.

Technical Parameters:

1.Main Structure: Steel Welded H Section
2.Purlin: C Section Channel or Z Section Channel
3.Roof Cladding: Sandwich Panel or Corrugated Steel Sheet with Fiber Glass Wool Coil
4.Wall Cladding: Sandwich Panel or Corrugated Steel Sheet
5.Tie Rod: Circular Steel Tube
6.Brace: Round Bar
7.Column & Transverse Brace: Angle Steel or H Section Steel or Steel Pipe
8.Knee Brace: Angle Steel
9.Wrapping Cover:Color Steel Sheet
10.Roof Gutter: Color Steel Sheet
11.Rainspout: PVC Pipe
12.Sliding Sandwich Panel Door or Metal Door
13.Windows: PVC/Plastic Steel/Aluminum Alloy Window
14.Connecting: High Strength Bolts

Packaging Detail:(1) packing the pipes into the bundles by the steel strip (2) packing the welded steel structure parts by some fabric (3) packing the small parts by bags and EPS foam (4) packing sets parts by some box
Delivery Detail:15 days after the deposite

Related Product for JDCC- two-story prefab steel structure buliding