ISO9001 prefab steel structure/steel frame warehouse/ light steel structure - Q23B,Q345B

prefab steel structure, 1. CAD drawing, 2. quick installation, 3. fireproof and waterproof, 4. validity:20-30 years - details see: https://www.buildingsupplieshub.com/iso9001-prefab-steel-structure-steel-frame-warehouse-light-steel-structure-10041089
Place of Origin: Hebei China (Mainland)Brand Name: WZHModel Number: Q23B,Q345BProduct Name: light steel frame structure
Material: H steel,C purlin,color steel, Bolt,door and windowDesign demand: wind load,snow load,live load, dimension,pitchColum: welded H steelBeam: C purlin
wall panel: eps,rockwool or color steel sheetroofing panel: eps,rockwool sandwich panel or color steel roofingwindow: Alualloy,plastic pvc windowdoor: Iron sliding door or electric door
Standard: ASTM,GB,DIN,JIS   
ISO9001 prefab steel structure/steel frame warehouse/ light steel structure
contact supplier for ISO9001 prefab steel structure/steel frame warehouse/ light steel structure


1.Breif introduction of the prefab steel structure/workshop/warehouse:

Light steel structure includes the process:design,producing and construction.It mainly has

threesystems:Main steel structure,secondary steel structure and maintainence steel

structure..

2.The following is the details of the prefab steel structure/workshop/warehouse:

Main Steel structure
NoItem and SpecificationPictures
1Column

A:Material:Welded H steel

B:Technique:Painted Q235 or Q345

2Roofing beam

A:Material:Welded H steel

B:Technique:Painted Q235 or Q345

3Crane

A: Weight:5 tons to 15 Tons

B:Optional

4Foundation bolt

A: Model:M24-M45

B: Thickness:0.5mm to 1.3mm

5High strength bolt 10.9S
Secondary steel structure
1Wall Purlin

A: C purlin

B: Painted Q235 or Q345

2Roofing purlin

A: C purlin

B: Painted Q235 or Q345

3Roofing beam support

A: l

B: Painted Q235 or Q345

4Column support

A: l

B: Painted Q235 or Q345

5Bracing

A:8MM to 15mm round steel

B: Painted

6Stay Tube

A:38mm *1.5mm to 3mm round tube

B:Painted

Maintainence steel structure
1Door

A: steel door or sandwich panel

B:Engineering or Manual

2Window

A:Plastic steel window or Alu-alloy Window

3Wall panel

A:950MM*50MM TO 150MM

sandwich panel

B: 0.3mm to 0.5mm

corrugated steel sheet

C:EPS or Rockwool sandwich panel

4Roofing panel

A:950MM*50MM TO 150MM

sandwich panel

B: 0.3mm to 0.5mm

corrugated steel sheet

C:EPS or Rockwool sandwich panel

5Ridge

A: Color steel sheet

B: Thickness:0.3mm to 0.5mm

6Accessory

Self-tapping screws,rivet,seals,

gutter,skylight window

3. For prefabricated steel structure/workshop/warehouse,needfollowinginformation

to design:

NoItemSpecification
1Dimension1.Total width: 2.Total length: 3. Building area 4.side wall height

5.Span 6.Column spacing 7.roofing pitch 8. Surface treatment

9. usage of builidng

2Design Index1.Design live load(KN/M2) on floor 2.design live load(KN/M2) on wall

3. Max crane load(Ton) 4. Max crane lift height (M)

5.Max window Load (KN/M2) 6. Max Rain Load (KN/M2)

7.Max snow load (KN/M2) 8. Max earthque Load (KN/M2)

3Enclosing system1.Exterior wallmaterial and thickness 2.roofing material and thickness

3.partition wall -material and thickness

4Window1.style: swing,sliding, or rolling 2. manual or engine 3. Size

4. quantity 5. position

5Door1.style: swing, sliding or rolling 2. manual or enging 3. size

4. quantity 5. position

6Others1.drainage system 2.ventilation 3.skylight

4.The installation process of the prefab steel structure/workshop/warehouse:

The following is the installation process: prepare foundation→install steel column→install column

bracing→assemble roofing beam→install roof beam→install roof beam brace→painting again

→fixed roof purlin and wall purlin→install roof panel →install wall panel→install door and

window→checked everything

5.The loading pictures of the prefab steel structure/workshop/warehouse:

Our company has four factories which can produce the steel structure,wall panel, roofing

panel,C purlin and other accessories ..The exported port is Tianjin port and Qingdao Port..

6. The application of the prefab steel structure/workshop/warehouse:

It is ususally used as the main steel frame of workshop,warehouse, school, shopping mall,

supermarket, Gas station,barton,Stadium, office building...

7.The advantage of the prefab steel structure/workshop/warehouse:

1.It can effectively increase the floor area utilization ratio about 6% through decreasing the cross-

section area of column and using the light weight wall...

2. Saving the energy about 50%, the wall using standard C purlin, squre steel,sandwich panel. so

it has good heat insulation and anti earquake..

3. The dead load is very light, so it has lower foundation cost

4. Fast construction, it just use about 3/1 time compared with the concrete building

5. Freindly-Enviroment,recycalbe using..

8.Other information of the prefab steel structure/workshop/warehouse:

1. Supply capacity: 10000 m2 per month

2. Moq: 50 Tons

3. Payment Term: TT or L/C sight

4. Delivery Time: wihin 30 days after receiving the deposit or L/C

5. H.S code: 9406000090

9. Our office and factory workshop:

10. Our customers from different countries:

We have exported our eps/pu/rockwool sandwich panel to austrilia,russia,new zealand,

Chile,Germany for good quality and best price..

11. Other proudcts Our company can provide:

We are a group company which has five factories.. we can produce the following building

product for u: the ppgi/ppgl steel coil,gi/gl steel sheet, corrugated gi/ppgi/ppgl steel roofing,

EPS/Rockwool/Pu sandwich panel. prefabricated houses, prefabricated steel structure...

14. The contact information of our company and me:

Packaging Detail:standard and seaworthy packing (waterproof paper + polyethylene rush inhibitor ,the antirust paper , the ring of defendse on inside and outside, steel belt , and the guard plate .)
Delivery Detail:within 30 days after signing the contract or L/C sight

Related Product for ISO9001 prefab steel structure/steel frame warehouse/ light steel structure