Iran Rail spike anchoring mortar for railway Concrete Project - CT-10

1:Rapid hardening , high strength, micro-expansion , cold construction operation ., 2:Environmental pollution - details see: https://www.buildingsupplieshub.com/iran-rail-spike-anchoring-mortar-for-railway-concrete-project-10089012
Place of Origin: Shandong China (Mainland)Brand Name: CaiTongModel Number: CT-10 
Iran Rail spike anchoring mortar for railway Concrete Project
contact supplier for Iran Rail spike anchoring mortar for railway Concrete Project


Iran Rail spike anchoring mortar for railway Concrete Project

Description:

The product is inorganic mixture, fast harden\ High intensity \ micro-expansion, Environment-friendly. do not need to warm up in normal condition (20°C\68°F \ 70 % Humidity). Mixed with water is available. Avoid crack due to partial warmed, which reduce the working time of rail spike. Constriction at -10°C\ 14F is available. Well performance after 2 million times destructive test

Applications:

1, It can be used in railway: rail spike anchoring of the concrete railroad crosstie \ crosstie of bridge. It can be used in anchoring of installed bridge bonded joined and the foundation bolt of instrument.
2, It can be used in railway\ tunnel \ channel \ coal mine \ Strengthen of bridge pier \ anti-crack of house \ Metallurgic mine etc. fast construction for anchorage of underground construction with anchoring component. In order prevent stone drop.
3.It can be used in the Strengthen of the concrete construction with reinforcing steel bar. And satisfy the weld of the reinforcing steel bar.

Specifications:

Vertical Expansion Rate (%)

Compressive Strength(M pa)

Rail spike pull-out resistance(KN)

4 hours1 day3 days
≥0.02>20>35>50>60

Standard : TB/T2093-2002

How to Use?

No.StepsToolsRequirements of ConstructionRemarks
1Take out the old rail spikespecial tools1. take out the old spike

2. Cleaning the hole of the rail spike.

It’s better to wet the hole with water
2Set the shelf of anchoragestickput the shelf of anchorage into the hole
3MixingContainer\ spoon\ bucketMix 14-16% water with the anchoring agent, mix evenlyAdd or reduce water according to situation
4GroutingspoonGrouting the mixed anchoring agent into the hole from the middle of the shelf of anchorage. 2cm to the top of the hole it’s better.
5Put the rail spikePut the spike after grouting, make sure it’s vertical.Make sure no oil stain on the spike
6clean upStickRemove the overflow materialGrouting again if the hole can not full enough
7Fix the fastenerT- spannerAfter anchoring (60 min), fix the fastener, screw down the nut with hand, after 120 min screw down the nut with T-spanner, 24hour screw down tightly as required
8Change the new railroadIt will be available after 1 day curing.It’s better to spray water after 1-3 days curing

Notices: dosage of each rail spike ±0.4 kg.

Picture:

Packaging Detail:20kg/bags, 25kg/bags
Delivery Detail:7-12 working days

Related Product for Iran Rail spike anchoring mortar for railway Concrete Project