highway railway metal sound barrier prices - FL-n107
Type: Sound Barriers,shutter or perforated | Place of Origin: Hebei China (Mainland) | Brand Name: FOREVERLOVE | Model Number: FL-n107 |
Material: steel or aluminium | Material Thickness: 1.0mm-1.5mm | Panel Height: 0.5m, 1m | Panel Length: 2.0m, 2.5m, 3m, 4m |
Panel Thickness: 8cm, 10cm | Post: 100*100*6*8mm, 125*125*6.5*9mm, 150*150*7*10mm,175*175*7.5*11mm | Surface Treatment: PVC coated or powder coated | Colors: green, clear, opal etc. |
Certification: ISO9001, CE |
highway railway metal sound barrier prices
1. noise reduction theory:
Sound barrier is installed between the sound source and receiver to have a function of noise reduction. Obviously, highway/railway sound barrier is applied to highway/railway to weaken the noise, so that the receiver zone would be affected smaller.
2. highway/railway sound barrier specifications:
metal panel 1. material:aluminum, steel 2. height:0.5m, 1m or as customer's requirement. 3.length:2.0m, 2.5m, 3.0m, 4.0m 4. thickness:80mm,100mm 5.type:shutter or perforated | |
two types:shutter or perforated | |
inner material of sound barrier: Absorbing cotton insulation | |
post size 100*100*6*8mm 125*125*6.5*9mm 150*150*7*10mm 175*175*7.5*11mm |
3. highway/railway sound barrier productive process:
sheet cutting--punching--assembling--packing
4. sound barrier applications:
*highway sound barrier
*railway sound barrier
*neighborhood sound barrier
*industrial area sound barrier
5. sound barrier features:
1) High light transmission
2) Weather resistance
3) Fire retardant
4) Temperature property
5) Light weight
6. package and loading:
plastic film with wooden or metal pallet
7. About us
Anping Forever Love Wire Mesh Products Co., Ltd.is engaged in production and development of sound barrier which is our featured product, wire mesh fence, barbed wire, gabion, and related products based in Anping, Hebei province, China, the famous wire mesh land of China.
Welcome your inquiry!
Packaging Detail:steel pallet and plastic film |
Delivery Detail:within 15-20 days after received the deposit |