hexagonal steel mesh - JH-01015
Place of Origin: Hebei China (Mainland) | Material: Stainless Steel Wire | Type: Weave Wire Mesh | Application: Gabion Mesh |
Weave Style: Plain Weave | Wire Diameter: 21#-25# | Technique: Woven | Model Number: JH-01015 |
Brand Name: JINHAO | other specification: as your requirement | Certificate: ISO9001:2008 |
hexagonal steel mesh
Materials:high quality low carbon steel wire, galvanized wire,High quality mild steel wire, stainless steel wire, etc.
Weaving Patterns:Straight twist, reverse twist, double twist.
Process:Galvanized after weaving or galvanized before weaving.
Finish:Electric galvanizing, hot-dip zinc plating, stainless steel or PVC coated.
Color:green, white, grey or other colors
Application:Hexagonal wire mesh with its good corrosion resistance and oxidation resistance, serves well as strengthening, protection and temperature keeping materials in the form of mesh container, stone cage, isolation wall, boiler cover or poultry fence in construction, petroleum, chemical, breeding, garden and food processing industries.
Straight twisted Hexagonal Mesh | ||||||
Opening | Wire Diameter (mm) | Wire gauge | Length x Width | Weight (kg) | Wire mesh roll diameter (mm) | Remarks |
1/2" | 0.71 | 22# | 3'x100' | 15.00 | 150 | Width of netting is within 2meters, in single or double wire edge. |
1/2" | 0.62 | 23# | 3'x100' | 11.50 | 150 | |
1/2" | 0.56 | 24# | 3'x100' | 9.30 | 140 | |
1/2" | 0.51 | 25# | 3'x100' | 7.50 | 130 | |
5/8" | 0.71 | 22# | 3'x100' | 13.00 | 150 | Width of netting is within 1.2 meters, in single or double wire edge. |
5/8" | 0.62 | 23# | 3'x100' | 10.00 | 140 | |
5/8" | 0.56 | 24# | 3'x100' | 8.10 | 130 | |
5/8" | 0.51 | 25# | 3'x100' | 6.70 | 120 | |
3/4" | 0.81 | 21# | 3'x100' | 14.80 | 170 | Width of netting is within 2meters, in single or double wire edge. |
3/4" | 0.71 | 22# | 3'x100' | 11.00 | 160 | |
3/4" | 0.62 | 23# | 3'x100' | 8.70 | 150 | |
3/4" | 0.56 | 24# | 3'x100' | 7.10 | 140 |
Packaging Detail:as customers' requirement. |
Delivery Detail:within 20 day after receiving the advanced payment. |