heavy steel fabrication framing prefabricated office building - WH134
Place of Origin: Shandong China (Mainland) | Brand Name: XGZ | Model Number: WH134 | color: red, blue, ivory etc |
steel material: Q345, Q235 | steel frame: H steel | lifetime: 50 years | wall/roof panel: steel sheet, EPS, glass wool, rock wool sandwich panel |
window: PVC, aluminum alloy window | door: sandwich panel, rolled-up door, sliding door | drawing: plan, elevation, 3D drawing | decoration: curtain glass wall/Composite Aluminum Board |
1. materials:
corrugated steel sheet for wall and roof
size: 30x100x8m
C section steel, Z section steel, square steel tube, H shape beam for framesteel structure
aluminum alloy shutter window and the plastic-steel for window
EPS/rock wool/glass fibre sandwich panel/steel/plastic steel/wooden/aluminum alloy door
shoring, cross bracing, tie-bar, intercolumniation
High-strength bolts and other components
2. futures:
connection method: welding.
anti-distortion, earthquake, wind and load.
steel structure with service life over 50 years.
steel anti-corrosive..
Maximization of available constructing space.
Surface treatment: static powder coating spray/zinc galvanized/anti-corrosion finish paint
12 workers can complete one warehouse of 3000 m2 in ONE month
3. services:
Reduce cost by integrating &manufacturing &service processes.
with reliable quality and efficient service.
offer one-stop service from developing, design, manufacturing to installation.
sizes and design as requirements..
Oversea projects we undertook in the last few years:
Prefab house(83.4M2)-20000set-Venezuela government
Aircraft Hangar(500,000M2)-Nigeria goverment
Industrial Warehouse (13000 M2 )—Argentina
Warehouse (14000M2)---- Republic of Uzbekistan
Workshop (12000M2)----Canada
Warehouse(3600M2)---Romonia
Vegetable Market(2500M2)---- Mauritius
Pig shed(3500M2)---USA
Chicken shed(2800M2)—Austrilia
Aircraft Hangar(1300M2)------Austrilia
Warehouse(900M2)---- Mongolia
Prefabricated house(70M2)----800 sets---Angola
Container house(20’)-----60 sets—South Africa
Packaging Detail:connection parts are wrapped by cotton blanket, foam filled in case of bump |
Delivery Detail:30-50days after deposit received |