Heat Meter for Chilled Water System - C03P
Place of Origin: Guangdong China (Mainland) | Brand Name: AKE | Model Number: C03P | Type: HVAC Systems |
Accuracy class: Class 2 | Environment class: Class A | Communication protocal: Modbus | Input signal: 4-20mA or 0-200Hz |
Operating voltage: AC220V | Calculation range: 0-999999.999999MWh | Size: 250*150*60(mm) |

Heat Meter
AKE Heat Meteris an energy meter used to calculate energy consumption for chilled water system.
It offers an accurate solution to measure individual energy consumption in virtually any liquid heating/cooling system.
It is also used to measure performance of energy saving systems or the loss of efficiency which isdirectly tied
to loss of revenue.
Working Principle
Heat Meter collects data from temperature sensor and flow meter, then based on Heat Exchange principle the system automatically integrates energy consumption and transfers it to PC. Energy consumption volume can be checked on Heat Meter with instantaneous temperature, flow rate and energy consumption shown on screen. Besides, you can check historical data by shape of bar chart on the Heat Meter.
Characteristics
1. Large LCD display, shows 4 lines in each screen;
2. Heating, Cooling both suitable;
3. Modbus communication protocal based on RS485;
4. 4-wires PT1000 temperature sensor to make sure the accuarcy;
5. Calculates and displays total cooling,heating consumption, shows real time data such temperature, flow rate, energy etc, besides it could be tracked historical data by day,month and year;
6. Shows histrorical data with bar chart, convenient to analyze and check;
7. Two flow rate signal input,Pulse mode 0-2000Hz and Current mode 4-20mA;
8. Accuarcy: Class 2;Environmental Class: A;
9. Can be auto setup small flowrate ignored;
10. Could be intergrated into AutoReading Meter system and BAS system.
Advantage
1) Electronic system, low effect from outside, long lifespan.
2) Easy to install and maintain.
3) Good reliability.
4) Energy-based cost billing system, more reasonable and energy-efficient.
Energy Saving Rate
Project Show
Guangzhou CITIC Plaza
Guangzhou International Finance Center
Shanghai Youyou International Plaza
Foshan Yongfeng Plaza
Hangzhou Xilong Hotel
Packaging Detail:Standard export package |
Delivery Detail:2 - 4 weeks |