Handrail

1.Mounted on a sturdy 0.080" (2mm) thick continuous aluminum retainer 2.Easy installation, clean-up and maintenance - details see: https://www.buildingsupplieshub.com/handrail-10000609
Place of Origin: Zhejiang China (Mainland)Brand Name: TJMaterial: AluminumMounted: Wall
Position: Deck Railings / Handrails,Stair Railings / Handrails,HOSPITAL   
Handrail
contact supplier for Handrail


1.Mounted on a sturdy 0.080" (2mm) thick continuous aluminum retainer

2.Easy installation, clean-up and maintenance

3.All mounting fasteners are included with each order
4. there can be made as per customers' requirements, several patterns and finishes optional.

1..Adopting high-polymer as outer decors: PVC,PP/ABS, antisepsis and antibiosis;

2.Simple installation, easy maintenance and durable service;

3.Multi-kind-color smooth lines;

4.Inside-lining with Cl-alloy or stainless steal, so firm and reasonable;

5.Surface finishing, fireproof, fast light, clean and simple;

6.Using steady firm support in order to provide reliable protection for weak disabled groups' walk.

Our company has been the membership of

Assessed Supplierfor five years.

Company Profile

We are one of theleading supplierof plastic extrusion mold and extrusion products.

Have the ability of producing more than500 setsof extrusionmolds in a year.

We have been in this plastic industry for13 years

Steps of Making Mould and Products

1.drawings or samples provided

Get the drawings or samples from our customers

2.Research & DevelopmentThe quality, mold life, arrangement, price, material, delivery time, payment term, etc.
3.Place an order with first paymentReceive the purchasing order and the first payment bank receipt from your side
4.Mould design ConfirmationDesign the mold for you as per your drawings
5.Mould makingAccording customer's specifications to build the mould. Before making the mould, we'll send mould design for customer's approval
6.Sample makingDo the mold test and send the samples for approval till you confirm it
7.The delivery time of mold or products7-25 days
8. DeliveryTo deliver goods by sea or by air, according to customers' requirements.
9. Balance PaymentT/T

Material: PVC/PE/PP

Packing and Service

Inner packing:Plastic film (PE) or as your request

External packing and Loading process

Sevice: Mold test of new parts; products following up; continuously improvement of products after batch production; getting products feedbacks from customers

Our working time: 8:00-17:00 (BEIJING TIME)

Packaging Detail:PLASTIC FILM
Delivery Detail:35DAYS

Related Product for Handrail