Green Shuttering Materials of WPC Formwork in Building Constrction - sy-R010

1.can replace plyeood, 2.High slip resistance, 3.Excellent thermal properties, 4.Contains no toxic chemicals or preservatives - details see: https://www.buildingsupplieshub.com/green-shuttering-materials-of-wpc-formwork-in-building-constrction-10089985
Type: Other Plastic Building MaterialsPlace of Origin: Liaoning China (Mainland)Brand Name: senyuModel Number: sy-R010
thickness: 12mmspecification: 1830*915mmcolor: greyweight: 14.5kg
density: 0.7 g/cm3   
Green Shuttering Materials of WPC Formwork in Building Constrction
contact supplier for Green Shuttering Materials of WPC Formwork in Building Constrction


Green Shuttering Materials of WPC Formwork in Building Constrction

Product advantages

1. Easy to strip. Concrete wont be sticky to the plastic formwork.

2. Adjustable size. The plastic formwork size is adjustable according to the requirement from the builder.

3. Bright and Smooth surface. The concrete is with smooth surface after stripped .

4. Steady quality.The PVC sheetis with very good mechanical strength, It can work well between -20 degree and 100 degree.

5. Easy to install and save labor. It is in light weight and can be processed to any shape and size, save labor.

6. Product attribution is good.The PVC sheetis antisepticise, inflaming retarding and waterproof.

7. Energy saving and environment protect.

8. Lower cost. Turnover can be up to over 30 times, so deeply reduce the cost.

Easy to cut

construction site

After demould

Packaging Detail:pallet or cartons. For a 20 GP container, can be loaded 1400 pieces.
Delivery Detail:within 10 days after receiving deposit

Related Product for Green Shuttering Materials of WPC Formwork in Building Constrction