Geo products geocell system for retaining wall - YT
High Intensity HDPE Geocell System, 1.welding distance:150-800mm, 2.height:50-250mm, 3.perforated or smooth surface - details see: https://www.buildingsupplieshub.com/geo-products-geocell-system-for-retaining-wall-10058068
Type: Geocells | Place of Origin: Hebei China (Mainland) | Brand Name: YT | Model Number: YT |
Material: HDPE | Type:: Geocells,Smooth/textured, perforated | Material:: HDPE | Color:: Black, Green, Yellow . |
Thickness: 1.0~1.7mm | Welding space: 330~1000mm |
Geo products geocell system for retaining wall
Introduction
Geocell System
1.welding distance:150-800mm
2.height:50-250mm
3.perforated or smooth surface
introduce
HDPE Geocell is made of welding high tensile HDPE broad bands. It has many cells and is very flexible.
It can be divided into four types
1. smooth surface without hole
2. smooth surface with hole
3. textured surface with hole
4. textured surface without hole
It can be replicated when transported and stretched to be filled with stones and soil when used, which can be as cushion coat to reinforce the soft base , and also to protect the slope when laid in the slope surface.
Applying Area
1.Be used for firm the roadbed of railroad;
2.Be used for firm highway soft foundation handling;
3.Be used for dike and retaining wall, which can bear load force;
4.Be used to harness the shoal water runway;
5.As pipeline and the sewer's propping up structure;
6.Be used for mixed type retaining wall that prevent the slope from falling down and bear load force;
7.Be used for independent wall, dock and breakwater;
8.Be used to harness the desert, beach and riverbed ,river bank
Construction method
1.Unfolding the geogrid (Some fiber-material can be put under the geogrid according to the concrete condition,for example geotextile and felted cushion.)
2.Fixing it with nail or connecting with the frame of stretcher;
3.Used loader to fill with filler until it is full top and beyond of the geogrid, then through vibration
and rolling, the subbase is completed
4.By now, the system of geogrid can prop up kinds of construction equipment, and that construction directly above it is accepted, together with conventional manner surface
Packaging Detail:Usually by packing tapes or load by pallet |
Delivery Detail:According to order quantity, generally within two weeks. |