galvanized steel plank for scaffolding
Place of Origin: TIA,Tian Jin China (Mainland) | Brand Name: ADTO | Type: Scaffolding Parts,scaffolding parts | Scaffolding Part Type: Scaffolding Planks,scaffolding plank |
product name: galvanized steel plank for scaffolding | Certificate: ISO9001:2008/SGS | Performance: same price,high quality | material: Q235 etc |
Service: Offer world-class after-sales service |
Galvanized scaffolding steel plank for scaffolding
1.steel plank/walk board for scaffolding
2.Material:Q235
3.Hot-dipped galvanised,Pre-galvanzied,Black
4.210/240/250/300mm
PRODUCT NAME:METAL PLANK
1) A larger capacity
When the scaffolding geometry and structure is compliant with the relevant requirements, the general single-tube column scaffold bears capacity of up to 15kN ~ 35kN (1.5tf ~ 3.5tf, design value).
2) Easy disassembly, erection and flexible
Easy to adjust the length of the tube, fastener connection is simple, and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold.
3) To compare the economy
Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about 15 kg.
Size (mm) | Weight (kg/pc) | Size (mm) | Weight (kg/pc) |
WALK BOARDS | CATWALK | ||
210 x 45 x 1.2 x 4000 | 13.60 | 500 x 50 x 1.2 x 1829 | 15.50 |
210 x 45 x 1.2 x 3000 | 10.26 | 480 x 45 x 1.2 x 1829 | 13.50 |
210 x 45 x 1.2 x 2000 | 6.93 | 450 x 45 x 1.2 x 1829 | 13.00 |
210 x 45 x 1.2 x 1000 | 3.59 | 450 x 38 x 1.2 x 1829 | 12.50 |
240 x 45 x 1.2 x 4000 | 14.87 | 420 x 45 x 1.2 x 1829 | 12.50 |
240 x 45 x 1.2 x 3000 | 11.23 | 500 x 50 x 1.2 x 1219 | 11.00 |
240 x 45 x 1.2 x 2000 | 7.59 | 480 x 45 x 1.2 x 1219 | 10.00 |
240 x 45 x 1.2 x 1000 | 3.94 | 450 x 45 x 1.2 x 1219 | 9.50 |
250 x 50 x 1.2 x 4000 | 15.67 | 450 x 38 x 1.2 x 1219 | 9.00 |
250 x 50 x 1.2 x 3000 | 11.84 | 420 x 45 x 1.2 x 1219 | 9.00 |
250 x 50 x 1.2 x 2000 | 8.00 | 330 x 50 x 1.2 x 1829 | 11.50 |
250 x 50 x 1.2 x 1000 | 4.15 | 330 x 50 x 1.2 x 1219 | 8.50 |
GALVANIZED SCAFFOLDING PIPE | SCAFFOLDING COUPLER | ||
48.3 x 4.0 x 6000 | 27.00 | Double Coupler | Swivel Coupler |
48.3 x 3.6 x 6000 | 24.52 | Sleeve Coupler | Inner Joint Pin |
48.3 x 3.2 x 6000 | 21.99 | Putlog Coupler | Girder Coupler |
48.3 x 3.0 x 6000 | 20.71 | Limpet Coupler | Ladder Clamp |
48.6 x 2.4 x 6000 | 16.89 | Steel Prop | Base Jack |
JIAYU Steel is a leading manufacturer of BS1139 scaffolding tube, system scaffoldings and accessories,
galvanized steel tube,Frames,steel props, metal planks and other related products.
• 7 years experience, sales volume reaches 1.5 billion US dollars.
• Good quality control in production process, ISO9001:2008,SGS,BV approved.
• Excellent quality and Competitive price, OEM is available.
• Available in an extensive range of stock or custom size.
• The whole process from material to finished products can be traced.
• Our factory is close to the port-Xingang,Tianjin.
We also Supply:
1.Galvanized Base Jack
2.Ringlock scaffolding system
3.Adjustable steel props
4.Adjustablescrew jack
5.Frame system, Metal plank
6.Scaffolding coupler& accessories
7.Cuplock scaffoldingsystem
etc. base jack
For more details, please contact us freely. ^——^
Packaging Detail:In bulk or 100 pcs per bundle or as your request. |
Delivery Detail:less than 25 days after received your deposit or L/C |