formwork water barrier - YN-formwork 079

1.manufacturer, 2.different type and size, 3.high strength bear capacity, 4.Euro and America standard, 5.customized available - details see: https://www.buildingsupplieshub.com/formwork-water-barrier-10079235
Place of Origin: Shandong China (Mainland)Brand Name: YenengModel Number: YN-formwork 079size: base plate dia.70mm/80mm/90mm/100mm/110mm
formwork water barrier
contact supplier for formwork water barrier


1. Wing nut

material: nodular cast iron / ductile cast iron

surface: galvanized or natural colour

base plate size: dia.70mm / 80mm / 90mm / 100mm / 110mm

tensile strength: more than 195KN

colour: natural, white, yellow

quality level: high quality

supply ability: 800tons per month

customized: available

2. The conventional products:

3. Our Main Products

(1) Formwork System Scaffolding & Accessories:

Wing nut and Tie rod; Steel panel and so on.

(2) Scaffolding System & Accessories:

Including Ringlock Scaffolding System and accessories; Cuplock Scaffolding System and accessories; Kwikstage Scaffolding System and accessories.

(3) Adjustable Scaffolding Jack Base & Accessories:

Including Hollow Screw Jack Base, Solid Screw Jack Base and Swivel Adjustable Screw Jack Base; Also the Accessories we can produce.

(4) Adjustable Steel Shoring Prop and Scaffolding Frame & Accessories :

Adjustable Steel Shoring Prop Including light-duty and heavy-duty,the type of base plate: flat-plate, flower-plate, u-head and cross-head. Scaffolding Frame including walk-through type, h type and mason type. We also produce all the accessories about them.

(5) Scaffolding Couplers

We can produce all kinds of forged and pressed couplers, including British type couplers, American type couplers, German type couplers and so on.

(6) We can also accept OEM service.

4. Materials

5. Electric furnace and smelting:

6. Mould making

7. Core making:

8. Casting process:

9. Sand blasting for removing rust:

10. Testing tensile strength:

11. Package and loading:

Packaging Detail:by woven bags then onto pallets
Delivery Detail:within 20 days after confirming the order

Related Product for formwork water barrier