Formwork System - AMP
Place of Origin: GUA,Guangdong China China (Mainland) | Brand Name: LEADER | Model Number: AMP | Material: Aluminium 6061 & 6082 |
Certification: ISO9001 | Patent: No. ZL200710031805.2 | Weight: 10.9kg(MIN);34.1(MAX) | Load: 90KN(MAX);20KN(MIN) |
Model: AMP120,AMP250,AMP350,AMP480,AMP625 | 8: Multi-directional ring connector | 9: High load capacity for single prop | 10: Support bracket for wooden beams |

Guangzhou Leader Equipment Ltd. will attend the BAUMA 2014 exhibition in ShangHai, China
Key features
NO-1 4 start screw Design. Collar screw enables height adjustment of 36mm for each revolution which is 25% faster
and 3 times in adjusting efficiency compared to adjustment for conventional steel prop.
NO-2 "The inner tube equipped with indication or measuring tape allowing
fast preadjustment and reduce laborious time spent on measuring and leveling.
NO-3 "U Head we can either supply an adapter or our self interlocking connector
for more fast and efficient mounting."
NO-4 "Our prop loading capability is far beyond slab loading requirement and
additional bracing not require"
NO-5 "Our flexible wedge lock design which can be mounted at any position/height of
the prop and able to fit in either the outer tube or the inner tube individually or simultaneously."
NO-6 "Testing result deviation much exceed the standard requirement
Leader prop single with height up to 6.25m.
NO-7 "The outer tube are power coated to avoid concrete adhering.The inner tube pattern
and threading design ensuring self concrete cleaning function and the collar screw
running free without jam even at extremely contaminated condition.
NO-8 "Leader prop have higher loading,flexible adjustment,easiest utilization, more capability ,better designs etc.
NO-9 "Leader prop are SGS certified to be in compliance to standard AS3610-1995 formwork for concrete
NO-10 Can be utilized in conjunction with LEADER GN50 Tubular Aluminum Scaffolding System as facade/Suspend Scaffold.
Leader Aluminium Shoring and Panel Slab Formwork System For Construction
Newly develop, high efficiency, low cost construction method.
It is the best substitution for the heavy weight conventional steel props.
" High efficiency "--- saves construction time.
" Safety "--- yields construction reliability.
" Economical "---reduces construction cost.
The light weight aluminum shoring system provides safe, reliable and high load bearing capacity, ample construction working spacing, simple operation, minimize labor, storage and transportation cost. The system can be utilized together with the unique “LEADER” Universal Aluminum Scaffolding Systemto obtain best performance with highest in the construction industry.
LEADER Universal Aluminum Shoring Systemis the best substitution for the heavy weight conventional steel props.
Aluminum Shoring and Panel Slab Formwork System
- Light weight and robust.
- High load bearing capacity for single prop.
- Fewer props using.
- Wider prop spacing. manufacturer
- High efficiency, low labor involvement in erection.
- Multi-direction connecting design.
- Infinity extend usage and application.
- Simple in operation.
- Safety utilization.
- Longer life, lowest wear and tear.
- Easy to move, transport and stow.
- Can be utilized in conjunction with “LEADER” Universal Aluminum Scaffolding System.
Prop Model | AMP120 | AMP250 | AMP350 | AMP480 | AMP625 |
L min(mm) | 800 | 1450 | 1980 | 2600 | 4300 |
L max(mm) | 1200 | 2500 | 3500 | 4800 | 6250 |
Outer tube length (mm) | 715 | 1365 | 1865 | 2515 | 4211 |
Inner tube length (mm) | 421 | 1071 | 1571 | 2221 | 1975 |
Weight kg | 10.9 | 15.5 | 19.3 | 24.3 | 34.1 |
Min~Max Load KN | 70~90 | 60~70 | 42~88 | 25~85 | 20~56 |
Leader Aluminium Shoring and Panel Slab Formwork System can be braced with frames to
be used as slab tables or shoring towers for various height. In combination with frames to
achieve essential stability.The Aluminium Shoring could with hold up to 90KN thus ensure
safety and rigidity while reduce the prop consumption and cut cost effectively.
Packaging Detail:EX-FACTORY PRICE-Bare package FOB-Steel base plus normal package |
Delivery Detail:30 Working days |