Floor heating manifold - 20mm
Place of Origin: Hebei China (Mainland) | Brand Name: Fosite | Model Number: 20mm | Type: Floor Heating Parts |
Floor Heating Part Type: mainfold | Material: brass | Application Areas: Heating |
Floor heating manifold
Size(mm): 20, 25, 32
Material: 100% new material
Install important point
1. The connection of pipe and fittings is hot melt. Flange is used to connect the steel pipe.
2. During hot melt connection use welding machine. The quality of welding machine must be guaranteed. To make sure the quality of connection.The portable welding machine applied to the final connection of the pipe and system of dn<63mm. The desk-mounted welding machine applied to the preframe connection of the pipe of dn75-160mm.
3. During heating and peg graft, we can’t move the pipe and fittings. We should insert them directly.
4. Welding technical parameters
OD(mm) | Welding depth(mm) | Heating time(s) | Welding time(s) | Cooling time(min) |
20 | 14 | 5 | 4 | 2 |
25 | 15 | 6 | 4 | 2 |
32 | 16.5 | 8 | 6 | 4 |
40 | 18 | 12 | 6 | 4 |
50 | 20 | 18 | 6 | 4 |
63 | 24 | 24 | 8 | 6 |
75 | 26 | 30 | 10 | 8 |
90 | 32 | 40 | 10 | 8 |
110 | 38.5 | 50 | 15 | 10 |
160 | 55 | 80 | 30 | 20 |
TIP: The welding time should delay 50% if the working temperature below 5 °C.
5. After the pressure testing we can close the pipe and use.
Packaging Detail:plastic bag, as your request |
Delivery Detail:Within 20 days after receive payment |