floor drain design and making with zamak 5 material - MLD-13-ZD029
Type: Door & Window Handles | Usage: Door,Window,door handles parts | Material: Zinc,zinc/zamak | Place of Origin: Zhejiang China (Mainland) |
Brand Name: MOLDIE | Model Number: MLD-13-ZD029 | Brand: MOLDIE | Model: MLD-13-ZD029 |
Shape: can be design according to your needs | Treatment: sand blast,powder coating, chrome plating and other you want | Process: Die casting | Origin: Zhejiang China |
Capacity: At least 1000pcs | Certificate: ISO9001:2008 Certificated and SGS |
OEM & ODM by customers’ design, quote according to your drawing and samples
Our engineer team manage from part drawing until shipment and check each step to make sure the final
products are qualified before shipment.
MOLDIE with its factory has more than 10 years experience for various mechanical stamping parts.
"Good quality" is the base of MOLDIE business, as all MOLDIE staff know quality is essential condition
for mechanical products, MOLDIE must keep our clients in a safe condition.
ISO 9001: 2008 certificated.
Since 2004, MOLDIE starts exporting various die casting parts to Germany, Spain, Italy, USA and so on.
To the aluminum products, we also can make the mold for your products, and we will send the sample to you,
we will start produce the products after you are satisfied with the sample.
Below are some info. about this product:
Brand | MOLDIE |
Model | MLD-13-ZD029 |
Material | Zinc/zamak |
Shape | Can be design according to your needs |
Color | Can be design according to your needs |
Process | Die casting |
Usage | Zinc door handle part |
Certificate | Obtain ISO9001: 2008 Quality System Certified |
Zamak 5 material making part advantages:
1.Quick delivery
2.Low quantity is acceptable
3.Strict quality control system.
4.Advanced equipment, excellent R&D teams
5.Professional technicians and rich experienced workers.
Below are some pictures about this product:
Packaging Detail:well packed for any damage during transport, such as pp bag or bubble bag and carton and pallet, it can be discussed |
Delivery Detail:within 30 days after PI |