flexible geocell for slope reinforcement - TGGS5--TGGS20
Type: Geocells | Place of Origin: Shandong China (Mainland) | Brand Name: dongyue | Model Number: TGGS5--TGGS20 |
Material: HDPE,PP,PE | name: geocell | Color: green/black/white | welding distance: 330/400/1000mm |
function: reinforcement and increasing the loading capacity | application: railway, road, highway, river bank, slope |
1.Features:
1. flexible to fold during transportation, stretching out
2. filled with stone or concrete during service, forming into structure with powerful lateral confinement and rigidity.
3. used as cushion coat to strengthen loading capacity of weak ground or slope protection structure
2.Applications:
1. Fix railway ground.
2.Fix weak ground of roads and increase loading capacicity.
4.used to build the support block struction
5.Act as independent wall, dock and break-water.
6.Treat desert, beach, riverbed and bank.
3.Construction method
1.Unfolding the geogrid (Some fiber-material can be put under the geogrid according to the concrete condition,for example geotextile and felted cushion.)
2.Fixing it with nail or connecting with the frame of stretcher;
3.Used loader to fill with filler until it is full top and beyond of the geogrid, then through vibration
and rolling, the subbase is completed
4.By now, the system of geogrid can prop up kinds of construction equipment, and that construction directly above it is accepted, together with conventional manner
4.Technical Parameter:
Polymer Density | High Density Polyethylene with density of 0.935 - 0.965 g/cm3 ASTM D 1505 |
Environmental Stress Crack Resistance | > 4000 hours ASTM D 1693 |
Carbon Black Content | Carbon black content 1.5% - 2.0% ASTM D 1603 |
Sheet Thickness | Smooth:1.1mm,1.2mm,textured:1.5mm ASTM D 5199 |
Cell Details | welding distance:330-1000mm |
Cell Depth | 50-250mm |
Seam Peel Strength | As per US Army Corps of Engineer's Report GL-86-19 Appendix A |
Seam Hang Strength | A 100mm wide seam sample supports a 72.5 kg load for a minimum of 30 days in an ambient room temperature environment. |
Certification | CE ,ISO |
5.Packing and delivery:
Packing:Packed in roll spooled in pipe or sleeve
Delivery: within 12 days after payment or deposit
Packaging Detail:packed in black pp bag like roll |
Delivery Detail:within 12 days after payment or deposit |