energysaving and quick installation workshop,light steel structure workshop,newest economic modular warehouse - BSS-71

1.Easy to assemble for the light steel structure., 2.Good steel plasticity and toughness., 3.Strong dapability for loading. - details see: https://www.buildingsupplieshub.com/energysaving-and-quick-installation-workshop-light-steel-structure-workshop-newest-economic-modular-warehouse-10039900
Place of Origin: Guangdong China (Mainland)Brand Name: BosenModel Number: BSS-71Size: as customer required
color: as customer requiredmaterials: steel&EPS sandwich panelsteel: Q235 or Q345earthquake resistance: grade 10
windows: pvc windows,Aluminum windowswind resistance: grade 12environment: green environmental protectionbrick: 50years
Volume: a 40HQ can load 220sqm   
energysaving and quick installation workshop,light steel structure workshop,newest economic modular warehouse
contact supplier for energysaving and quick installation workshop,light steel structure workshop,newest economic modular warehouse


detailed description

1.High quality: We have our own technical teams, so we can design according to you demand.

2.Low cost :Compare with other material, the steel structure material can save a lot, ncluding the cost and labor.

3 Easy installation :The steel structure building can finish assemble in a short period, and it is easy to assemble and dismantle.

4.Safe: Steel material performs well in disasters such as typhoon and earthquake.

Drawings&Quation:

1.Customized design to welcome.

2.As long as you like ,we can design and provide drawings for you.
3.In order to give you an exactly quotation and drawings, pls tell us the Length,width,eave height and local weather . we'll quote and design for you prompt

the drawing of the steel structure

the list of the steel structure

detail of steel structure

roof live load:0.3kn/m2 - 0.5kn/m2

snow load:0.35kn/m2 - 0.5kn/m2

wind load: 0.35kn/m2 - 0.5kn/m2

fireproof grade:grade B1

installation of the steel structure

wall panel and roof panel installing

packing and shipping

Internal details diagram

installfinished

Installation process

Our technical team
our factory has four teams to install house,they are all prefessional,and about 15days can install 500sqm steel structure.
our company
our department
Packaging Detail:Nude Packing
Delivery Detail:About 10-15 days

Related Product for energysaving and quick installation workshop,light steel structure workshop,newest economic modular warehouse