EIFS base coat - SA802

-Dry,bagged product, -Mix only what you need, -Lower cement-to-polymer ratio, -Smooth,creamy consistency, -Speeds mesh embed - details see: https://www.buildingsupplieshub.com/eifs-base-coat-10082641
Place of Origin: Shanghai China (Mainland)Brand Name: SAModel Number: SA802Usage: Joint Mortar
Type: Cement MortarQuality Management System: ISO 9001:2008Main components: Cement, sand, emulsion polymers,cellulosic rheology modifiersApplication: energy-efficient exterior insulation and finish systems (EIFS)
EIFS base coat
contact supplier for EIFS base coat


Shunan base coat render of EIFS

A comprehensive line of base coats used to embedded mesh, trowels easily, speeds mesh embedment,
reduces applicator arm fatigue, increases jobsiteproductivity.

PRODUCT INFORMATION

PRODUCT PACKAGING

• Weight: 25kg

• Color: Natural cement grey

• Shelf life and storage: 6 months after manufacturing date in dry ventilated place

• Standard: JG149-2003

• Storage: unopened bag on plate in dry place

• Production date & batch number: find on outside of bag

Water addition

0.22 liter/ kg powder (5.5 L of Water for 25 kg of mortar)

Field of application

The function of this product is to protect the XPS board and fix the mesh. The finishing coat can be tile or plater, paint etc...

Consumption

4.5 ~ 6 kg/m2

Technical Data

Tensile Adhesive Strength, Mpa

(with foamedpolystyrene)

Original≥ 0.10

(polystyrene board damaged)

Water resistant≥ 0.10

(polystyrene board damaged)

Freeze - thaw resistant≥ 0.10

(polystyrene board damaged)

Flexibility property

Compressive strength/ flexural %

(cement based)

≤ 3.0
Cracking strain % (non cement base )≥ 1.5

Processing/working time h

1.5~4.0

Tools

electric-mixer, trowel, bucket

Substrate requirement

1) Polystyrene board must be clean (no dust or dirt)

2) Polystyrene board must be fixed stably (Wait min 24h before applying shunan. therm epsad)

3) The surface of the whole polystyrene board wall must be level
Preparation
• Polystyrene board must be fixed stably

• Make sure the whole polystyrene wall is flat

Working Place

Remarks

1) Only mix with water, no other addition

2) The temperature of air and glue must be from 5°C~35°C

3) The glue must be used up in 2h

4) Avoid sunshine, high temperature and freezing

5) Avoid strong wind during application

6) Avoid rain during application

Safety
1)May cause serious damage to eyes
2) May be sensitive to skin in case of contact. lrritable for eyes, respiratory system and skin
3) Keep out of the reach of children
4) Avoid breathing the dust
5) In case of contact with eyes,rinse eyes immediately with plenty of water and consult a doctor
6) Wear suitable protective clothing,gloves and eye/face protection
External Insulation and Finishing Systems (EIFS)

Packaging Detail:In 25kg (55lbs) bag
Delivery Detail:3 days

Related Product for EIFS base coat