economic prefabricated steel frame with light gauge steel - tm-11
Place of Origin: Shanghai China (Mainland) | Brand Name: tonybuilding | Model Number: tm-11 | Material: Steel |
Use: Carport,Hotel,House,Kiosk,Booth,Office,Sentry Box,Guard House,Shop,Toilet,Villa,Warehouse,Workshop,Plant |
About Tonybuilding:
Shanghai Tonybuilding Systems Co., Ltd., is a professional integrated building supplier with new building system-----light gauge steel(LGS) framing system.
Our system can be used for residential house, office building, apartment building, hotel etc. We can supply not only solution of prefab building system but also light gauge steel (LGS) materials or all building materials. We have top level imported coldformed stud machine and professional software which can give client top quality products and service. Our software and machine can design and produce buildings from one floor to six floor with full light gauge steel (LGS) system.
As one of the earliest teams of using light gauge steel (LGS) framing system in China, we have accomplished several villas by using this system successfully as early as 1996. Our team also did lots of projects at abroad. We finished many projects in North America, South America, Africa, Asia and Europe countries with this new concept, for example four floor motel and shopping mall in USA, villa in USA, South America, Asia and Africa. Our experienced engineer can help and support client to finish their project with expertise.
Our business philosophy is "Better mind, Better building". We hope to make the life of people around world better with our concept and building.We regard best products and service as our responsibility. We are willing to actively promote our industrialized system to you. We are looking forward to forming successful business relationships with customers at home and abroad on mutual benefits.
Advantages of Light Gauge Steel System:
1. Free from the damages by inspects, such as white ants and so on
2. Steel code: Q345, G550
3. Designed life span: more than 50 years;
4. Green and environment-friendly materials used;
5. Seismic resistance up to 9 magnitudes
6. Safe---Able to stands for maximum 55 m/s typhoon
7. Advanced roof and wall cladding material guarantee excellent acoustic insulation, less 65% energy consumption than the concrete structure
8. Additional 10%-15% net area compared to the traditional building, air cavity between the cladding and main structure guarantees the comfortable indoor space.
Advantages of Shanghai Tonybuilding:
1. Better Culture and Managerment:
2. Better Team and Service:
1. 16-year LGS Profession
2. Overseas On-site Instruction
3. Comprehensive System Solution
3. Better Machine and Software:
4. Better Prodcuts:
The following is the material list for reference:
Standard configuration sheet | |||
No. | ITEM | Materials | Luxury home |
With E.P and finishing | |||
1 | Foundation | BOLT/SETSCREW | chemical bolt |
cushion tape | aspalt tape | ||
2 | HOUSE STRUCTURE SYSTEM | Sturcture | LGSF |
CONNECTION | H.G BOLT | ||
Screw | self-drilling scress | ||
cladding | 50MM ALC PANEL | ||
Vapor barrier | DUPONT Vapor barrier sheet | ||
Exterior door | security door | ||
windows | Alum. Windows | ||
interior door | solid wood door | ||
frame of D/W | GRC finishing | ||
Insulation/batt | glass wool | ||
3 | Interior wall | interior wall | 12.5mm plaster board |
partion wall | 12.5mm plaster board | ||
partion wall frame | L.G.S.F. | ||
TILE FOR KIT AND W/C | Included | ||
cornering | plaster cornering | ||
Skirting | solid wood | ||
4 | floor system | floor system | jiost+18mm plywood |
flooring | wooden flooring | ||
Insulation/batt | glass wool | ||
Water-proof for W/C | Included | ||
ceiling | 9mm plaster board | ||
stairs | steel stairs with armrest | ||
5 | roofing system | roofing | steel roofing/asphalt shingle |
Vapor barrier | Du Pont Vapor barrier sheet | ||
strength board | 12mm plywood | ||
Insulation/batt | glass wool | ||
ceiling | 9mm plaster board | ||
eaves board | 12 Fiber cement Board | ||
downpipe system | PVC downpipe system | ||
6 | water supply and drainage | hot&cold water pipe | PPR PIPE |
Downpipe | PVC downpipe | ||
others | toilet,washbasin | ||
7 | ELV system | telphone | prepunch whole |
CABLE TV | prepunch whole | ||
INTERNET CABLE | prepunch whole | ||
8 | Electrical system | cable and pipe | prepunch whole |
lighting | ceiling light | ||
distribution box | Included | ||
switch | Included |
Packaging Detail:Meets sea/land transportation requirements; easy to be loaded into container |
Delivery Detail:15-30days |