Drywall Metal Channel - HL-MC-003
Type: Ceiling Tiles,Ceiling grid component | Place of Origin: JIA,Jiangsu China China (Mainland) | Brand Name: HUILON / OEM,HUILON | Model Number: HL-MC-003 |
Function: Fireproof,Moisture-Proof,Mould-Proof,Smoke-Proof,Waterproof | Feature: Artistic Ceilings,Integrated Ceilings,Moisture-resistant | Ceiling Tile Shape: Square | Ceiling Tile Type: Metal Ceilings |
Surface Treatment: Brushed,Film Coated,Spray Painted | Metal Ceiling Material: Galvanised Steel,Stainless Steel | Certification: ISO9001:2008 | Advantage: manufacturer |
Technology: Germany Technology | Surface: Zinc Galvanized | Perforated or not: Perforated | Style: Drywall Metal Channel |

Drywall Metal Channel
Drywall Metal Channel is galvanized lightweight steel .C section is used to form the vertical frame. Choose the correct stud to suit all performance criteria. Extra Rigidity can be achieved by reducing the centers of the studs.
PRODUCT NAME | PRODUCT MARK | DEMENSION(MM) | REMARKS |
COVERING CHANNEL | DC60 | 60*27*0.6 | LENGTH CAN BE PROVIDED |
DC50 | 50*19*0.5 | ||
DC50 | 50*19*0.6 | ||
SUPPORTING CHANNEL | DU60 | 60*27*1.2 | |
DU50 | 50*15*1.2 | ||
DU38 | 38*12*1.0 | ||
COVERING CHANNEL | QU | 50*40*0.6 | |
75*35*0.6 | |||
100*35*0.6 | |||
150*40*0.6 | |||
SUPPORTING CHANNEL | CU | 50*45*0.6 | |
75*45*0.6 | |||
100*45*0.6 | |||
150*45*0.6 |
Metallic Components
Ceiling Suspension & Drywall Metal Stud
System General Drawing
Accessories:
A comprehensive range of accessories is available to complete the wall partition and ceiling suspension. Intersection connector is to locate primary and secondary channel is C-form Ceiling system
The gauge, Thickness, width, length could be provided according to the customers' requirements.
Drywall Metal Channel's picture
Packaging Detail:1.Standard export packing(carton box)2.Also cater to the customer's requirements3.Drywall Metal Channel |
Delivery Detail:15 days after deposit or L/C issued |