Double Mast Man Lift - GTWY12-200S

Double Mast Man Lift, 1.CE certified, 2.Suitable for 1 person to reach 12m, 3.Good for maintenance, 4.Change bulbs or lamps - details see: https://www.buildingsupplieshub.com/double-mast-man-lift-10060130
Type: ElevatorsPlace of Origin: Jiangsu China (Mainland)Brand Name: BalanceModel Number: GTWY12-200S
Usage: Lift machineDrive Type: AC,DC,HydraulicElevator Type: Passenger ElevatorsMaterial: High strength high-quality Aluminum Alloy
Color: Red, Yellow, Blue, etcSuitable Workers Quantity: 1-2 personsMast Quantity: Single, Double, Three, Four, SixSupporting Leg: 4 pcs
Working Height: 4m, 6m, 8m, 9m, 10m, 12m, 14m, 16m, 21m, etcRated Loading Capacity: 125kg, 150kg, 200kg, etcWalk Way: Manual or AutomaticDrive Mode: Double Mast Man Lift accept different drive: AC, DC
Merit/Advantage: High strength, Compact structure, Light weight, Lifting stable, etc   
Double Mast Man Lift
contact supplier for Double Mast Man Lift


Double Mast Man Lift

Breif introduction

This Double Mast Man Lift has the following features:

1.1 Stable lifting and lowering: The unit adopts seamless transmission between the lifting masts, thus minimizing the amount of sway after lifting.

1.2 High quality materials: High-strength aluminum alloy are used for all lifting mast, the unit is light, easy and convenient to move.

1.3 Safe and reliable: The unit is designed with leveling stabilizer which includes two types of support; one is the height-adjusting bolts for leveling and the other is the outriggers for preventing inclination. Hydraulic and electrical system with an Emergency lowering device enables you to lower the platform slowly to its ground position when power is unexpected fail.

1.4 Convenient: As the lifting masts are made of aluminum, the unit is light and compact. The compact design allows the whole unit to enter into standard doors and elevators. It is easy to move and pass through narrow passages. In most cases, only one person is required to move the equipment.

CE certificated.

Suitable for single person to work upraised Maximum working height from 3 to 21m.

Power supply can be AC, DC or AC&DC according to customer's needs.

Services:

We supply spare parts free for one year, and supply the technical supporting all the time.

Parameters of Double Mast Man Lift:

TypeModelWorking Height

m

Rated Capacity

kg

Platform Size

m

Motor Power

kw

Weight

kg

Packing Size

m

Single Mast

GTWY4-1005.71250.6×0.551.11851.05×0.75×1.65
GTWY6-1007.71250.6×0.551.12101.3×0.8×1.65
GTWY8-1009.71250.6×0.551.12501.3×0.8×1.98
GTWY9-10010.71250.6×0.551.12801.35×0.85×1.98

Dual- Mast

GTWY6-200S7.72001.18×0.61.13201.35×0.85×1.65
GTWY8-200S9.72001.18×0.61.13851.35×0.85×2
GTWY10-200S11.72001.38×0.61.14901.55×0.95×2
GTWY12-200S13.72001.48×0.61.15601.65×1×2

Tri-Mast

GTWY10-20011.72001.4×0.932.29301.65×1.1×2.05
GTWY12-20013.72001.5×0.932.29801.75×1.1×2.05
GTWY14-20015.72001.5×0.932.210001.75×1.1×2.42

Multi-Mast

GTWY16-16017.71501.48×0.81.5/0.7514002.26×1.2×2.08
GTWY18-16019.71501.48×0.81.5/0.7515002.26×1.2×2.18
GTWY20-16021.71501.58×0.81.5/2.217802.36×1.4×2.5
GTWY21-16022.71501.58×0.81.5/2.218802.36×1.4×2.6

Products photos:

Application:

They are widely used in factories, Star Hotels, restaurants, railway stations, airports theaters , exhibition halls and other places, It's the best security partner together with maintenance of equipment, paint renovation, replacement lamps, electrical appliances, cleaning and maintenance and other uses.

Certificates:

Superiority:

1. We had already passed the authorization by ISO9001:2008 and CE and established a complete set of quality assurance system.

2. Under such a complete set of quality assurance systems, there is a complete set of regulations for ordering, order handling, quality design, purchasing raw materials, working out production plan, production, test and inspection, packaging, storage, delivering, trace, keep in touch with clients, etc.

3. The CNC control center and PC-based production and marketing system not only improves the working efficiency but also assures the products quality.

4. Our test lines are equipped with a large amount of online test instruments, so that they can ensure and improve the products quality.

5. We also have a complete set of equipment and techniques for testing and controlling the performance of products, which ensures our Double Mast Man Lift quality to take a leading position among the fellow products at home and reach the international standard.

Packaging Detail:Pallet, Plywood box, Steel strip, Containers available, according to the model and quantity.
Delivery Detail:10-15 days upon receipt of the payment

Related Product for Double Mast Man Lift