Doka reusable Steel construction formwork - construction formwork
Q235 Steel construction formwork, 1.Durable and easily install, 2.Surface: Electroplated,Zinced,Coating,Painting. - details see: https://www.buildingsupplieshub.com/doka-reusable-steel-construction-formwork-10073659
Place of Origin: Beijing China (Mainland) | Brand Name: AC | Model Number: construction formwork | Material: Q235 or Malleable |
Type: Normal and Abnormal | Surface: Coating,Electroplated,Zinced | Certification: BS1139, EN74, ISO9001 | Color: Customized |
Delivery: 10~25 Days after Your Payment | Package: in Bulk or Pallet | Payment: T/T, West Union | Craft: Forging |
Feather: construction formwork |

Doka reusable Steel construction formwork
1.Material: High Strenthen Q235 or Malleable
2.Craft: Stamping
3.Surface: Electroplated,Zinced,Coating
4.Certificate: BS1139, EN74, ISO 9001
5.Steady Welding Point
6.Sample Allowed
7.Every Thing Can Be Done through Your Ewquest
All things can be producted under your will !!
Place of Origin | China(mainland) |
Brand Name | AC |
Height | 330, 270, 120, 60 mm |
Width | 240, 120, 90, 72, 60, 30, 24 mm |
Material | Q235 Steel |
Stability | up to 80 kN Pressure Absorption |
Minimum Order Quantity: | Contact Us for MOQ |
Port: | Tianjin |
Packaging Details: | Depends on the Order |
Delivery Time: | Depends on the Order |
Payment Terms: | T/T, West Union |
You are welcom to Contact us to gain more details!
Packaging Detail:in Bulk and pallet |
Delivery Detail:in 10~25 Days aftter Your Paymnt |