CQS for whole set gypsum powder factory equipment with advanced Manufacturing Facility - RBGP-200

CQS for whole set gypsum powder factory equipment, 1.Factory Experence:13 Years, 2.Certificate:CE, ISO, 3.Checking:CIQ, SGS - details see: https://www.buildingsupplieshub.com/cqs-for-whole-set-gypsum-powder-factory-equipment-with-advanced-manufacturing-facility-10086173
Place of Origin: Hebei China (Mainland)Brand Name: RubinModel Number: RBGP-200Iterm: whole set gypsum powder equipment
Checking: CIQ, SGSAutomatic: Full automaticTechnology: Newest advanced tech and German techFuel: Coal, natural gas, heavy oil or light oil
Situation: Brand newExperience: 13 yearsGuarantee: 5 yearsmachine installation and commission: 2 to 4 months
delivery time: 2 to 5 months after the deposit   
CQS for whole set gypsum powder factory equipment with advanced Manufacturing Facility
contact supplier for CQS for whole set gypsum powder factory equipment with advanced Manufacturing Facility


CQS whole set gypsum powder Factory equipment with advanced Manufacturing Facility

5years Guarantee & Designing & Manufacturing & Installation &Training

Brief introduction ofGypsum Powder Production Line

The crusher breaks the big sized gypsum ore into small ones with 25mm in diameter. After storing and conveying, they are taken into the mill for grinding. Then, the power concentrator carries the gypsum powders which match to the needed fineness to the calciner for calcining. Others are back to the mill until it is qualified. In the end, after calcining, the qualified gypsum powder are sent to clinker container for storing, or are sent to the manufacturing workshops for use.

ItermGypsum Powder Production Line
StyleCalciner( fluidized bed furnace)
Annual capactiy15000 to 200000 tons
Experience13 years ( Chinese Army manufacturer )
Guarantee5 years and forever after sales service
Coopration CountriesIran, Pakistan, India, Ethiopian, Uzbekistan, Egypt, Saudi Arabia, ect.
Workers needs16 Total
Fuel varietyCoal, natural gas, diesel oil, heavy oil, ect.
Payment termsTT or LC
PortTianjin,Xingang
Delivery Time2 to 5 month after receive the deposit
PackingIn wooden case and in nude

40GP container and FR container

average weight of container: 20 tons

Gypsum Powder Production Line:

Factory & Manufacturing & Delivering & Cooperation

Packaging Detail:In wooden case and in nude 40GP container and FR container average weight of container: 20 tons we can offer loading pictures for your reference
Delivery Detail:2 to 5 month after deposit

Related Product for CQS for whole set gypsum powder factory equipment with advanced Manufacturing Facility