cost-efficient and high quality prefabricated villa - DP-V-1
Place of Origin: Zhejiang China (Mainland) | Brand Name: Deepblue | Model Number: DP-V-1 | Main structure: Light Gauge Steel |
Wall material: ALC panel/fibre cement cladding+MGO board/gypsum board | Insulation material: glass wool or EPS/XPS/PU sandwich panel | Roof: EPS sandwich panel/steel roofing/asphalt shingle | Ceiling material: MGO board/gypsum board |
Flooring: laminate /wooden/tile/PVC carpet | Door: steel security door/WPC or wooden door | Window: aluminum alloy/PVC | Other fittings: toilet,washbasin,shower,kitchen etc. |
Life time: 100 years for structure |
cost-efficient prefabricated villa :
ISO standardlight gauge steel for main structure.one or two also three floors available.fireproof,heat insulation,wind and earthquake resistance.green,energy save.economically.
How To Assembleprefabricated villaOn Site:
prefabricated villaDesign code:
(1)AISI S100 North American Specification for the Design of Cold Formed Steel Structural Members published by the American Iron and Steel Institute (AISI) in the United States.
(2)AS/NZS 4600 Australian/New Zealand Standard-Cold-formed steel structures jointly published by Standards Australia and Standards New Zealand.
(3)BS 5950-5 Structural use of steelwork in building-Part 5. Code of practice for design of cold formed thin gauge sections published by BSI in the UK.
(4)ENV1993-1-3 means Eurocode 3: Design of steel structures; Part 1.3: General rules, Supplementary rules for cold-formed thin gauge members.
Why Choose Light Gauge Steel Structure?
1)Lifetime for structure: 100 years.
2)Earthquake resistance: mix more than 8 grades.
3)Wind resistance:max 60m/s.
4)Fire resistance:all the materials used can be fire resistance.
5)Snow resistance:max 2.9KN/m²as required
6)Heat insulation:100 mm in thickness can match 1 m thickness of brick wall.
7)High acoustic insulation:60db of exterior wall 40db of interior wall
8)Insect prevention: Free from the damages by insects, such as white ants
9)Ventilation:a combination of natural ventilation or air supply keep the indoor air fresh and clean
10)Packing and delivery: 140SQM/ 40'HQ container for structure only and 90SQM/ 40'HQ container for structure with decorate materials.
11)Installation:the average is one worker one day install one SQM.
12)Installation guide:dispatch engineer to guide on site.
Technology Details:
Material Configuation:
No. | Item | Materials | Standard house | No. | Item | Materials | Standard house |
1 | Foundation | Fixing to Foundation | chemical bolt | 6 | Roof system | roofing | ceramic /asphalt shingle |
cushion tape between frame and foundation | asphalt tape | water-proof layer | asphalt layer | ||||
2 | House Structure System | Main sturcture for house | 0.95mm thk *89mm wide Steel frame | strength board | 12mm OSB board | ||
Floor Joist (if multi stories) | 0.95mm steel joist | Insulation/batt | normal glass wool | ||||
Connection | self-drilling scress | eaves board | 9mm MgO board | ||||
3 | Exterior Wall | Ext. wall Cladding | 14mm fiber cement board or vinyl siding | downpipe system | PVC downpipe system | ||
Reinforce layer | 12mm Osb board | 7 | Kitchen and bathroom | Kitchen cabinet | normal cabinet | ||
Vapor barrier | Normal Vapor barrier sheet | wall cabinet | based on design | ||||
Insulation/batt | normal glass wool | counter top | standard arclicy top | ||||
inter of ext .wall | 12mm plaster board | Sink | double stainless sink with faucet | ||||
4 | Interior Partition wall | siding | 12mm plaster board | toilet | normal toilet | ||
cornering | plaster cornering | bathtub | normal bathtub | ||||
Skirting | normal Plywood and PVC | shower | normal shower | ||||
5 | Floor System | sub floor for ground floor (Wet area ) | NULL | 8 | Doors and windows, plumbing | Exterior door | security door |
Sub floor for other floor ( Wet area ) | 20mm MgO board | windows | alum. windows | ||||
flooring for gound floor (dry area) | HDF flooring | interior door | normal plywood door | ||||
flooring for gound floor ( wet area) | normal ceramic tile | hot&cold water pipe | normal PPR PIPE | ||||
Flooring for other floor (wet area) | normal ceramic tile | Downpipe | normal PVC downpipe | ||||
Flooring for other floor dry area | HDF flooring | 9 | Electrical system and multi media | telphone cable | prepunch whole | ||
Insulation | glass wool | TV. CABLE | prepunch whole | ||||
Ceiling for dry area | 9mm plaster board | internet cable | prepunch whole | ||||
ceiling for wet area | 9mm plaster board | electrical cables | included | ||||
stairs (If have) | steel stairs with armrest | lighting | Null | ||||
notice: | distribution box | Included | |||||
1 | EX.W mean EX.works, pls find explaination from wikipedia | switch | Included | ||||
2 | This price does not include foundation ,cement works and any other cost. | 11 | Others | INSTALLATION FEE | Optional | ||
3 | This price does not include design fee. | SUPERVISOR | Optional | ||||
4 | This price does not include any furnitures and others. | ||||||
5 | This price is only for listed materials | ||||||
6 | All electrical is based on Chinese standard equipments. | ||||||
7 | The total widnows area is no more than 15% of building area. The ceiling height is calculated 2.5m. | ||||||
8 | Final price need to be confirmed based on final drawings and order-confirm-letter. | ||||||
9 | If you have any questions, pls contact DEEPBLUE. |
Packaging Detail:prefabricated villa's packing:light gauge steel in bulk,decorate panel materil in pallet,other fittings all in boxes,loaded into 40'HQ and 20`GP sea container. |
Delivery Detail:depends on the building area,normal 35 days |