container prefabricated tent house home sheds - YH T-style
Place of Origin: Guangdong China (Mainland) | Brand Name: YH building | Model Number: YH T-style | Body structure: U shaped steel and angle iron |
Roof: PU or EPS sandwich panel | Ext-wall: EPS sandwich panel | Partition wall: EPS sandwich panel | Floor: One/two/three |
Size: Standard or customize | Packing: 300-500m2 40FT container | Installation: Professional guide | Layout design: Technical support |
Stock: Standard prefab house |
Prefabricated House Features
- Light steel structure prefabricated house with color steel sandwich panel
- Good ability to assemble and disassemble for several times without damage.
- Doors, windows and interior partitions can be flexibly fixed
- Ceiling, floor, eaves, and color steel door are optional for customers.
- Cost saving and transportation convenient
- Anti-rust.
- Widely used in construction site, office building, dormitory etc.
- Single storey, double storey or three storey for choice
- Single slope or double slope for choice.
YH prefab house | ||
1 | Body structure | Profile steel and angle steel |
2 | Roof | PU sandwich panel EPS sandwich panel Color coated corrugated panel without insulation layer |
3 | Ex-Wall | EPS sandwich panel |
4 | Partition wall | EPS sandwich panel |
5 | Window | Aluminum window / PVC sliding window |
6 | Door | EPS Sandwich panel |
7 | Connection way | Stone bolt and high strength bolts |
If two or three floors | ||
1 | Staircase | Comprise of steel structure |
2 | Footpath | Galvanized Steel Plain Sheet press |
3 | Indoor floor board | 15mm plywood or customize |
Application remind:
1. Please don't change the structure, don't pick out any screws or parts and don't increase or decrease any partitions after the installation. If necessary please contact us and do the changes afterour permission. Or you have to afford the result yourself.
2. The light steel parts should paint in one to two years in order to keep it's service time longer and the external appearance looks as good as new.
3. Prefabricated house is the whole connection of steel construction parts. If you want to use the electricity facilities, please don't bond the lines directly onto the steel structure. You have to use some abundant parts to put the lines and facilities to avoid accident.
Packaging Detail:standard packing |
Delivery Detail:7-15days |